Task of Reinforcement Bar Redesign

碩士 === 國立臺灣科技大學 === 營建工程系 === 87 === Many specialists are too professional to deem various hidden problems as abnornal. As a result, many opportunities of solving problems are lost and numerous wastes are resulted. The wastes are invisible. They are burden of a company and are difficult to be notice...

Full description

Bibliographic Details
Main Authors: Yu-Lien Chang, 張玉連
Other Authors: Yeng-Horng Perng
Format: Others
Language:zh-TW
Published: 1999
Online Access:http://ndltd.ncl.edu.tw/handle/47261557062707992019
id ndltd-TW-087NTUST512031
record_format oai_dc
spelling ndltd-TW-087NTUST5120312016-02-01T04:12:44Z http://ndltd.ncl.edu.tw/handle/47261557062707992019 Task of Reinforcement Bar Redesign 鋼筋作業重新設計 Yu-Lien Chang 張玉連 碩士 國立臺灣科技大學 營建工程系 87 Many specialists are too professional to deem various hidden problems as abnornal. As a result, many opportunities of solving problems are lost and numerous wastes are resulted. The wastes are invisible. They are burden of a company and are difficult to be noticed and/or discovered. Eventually, the company becomes lack of vitality. The study applies the free thinking concept on the basis of productivity analysis and the foundation of JIT(Just in time) theory. It also provides the strategy of waste prevention for all the individual cases. According to the investigations, the cost for reinforcement bar assembly is one of the four construction tasks with high cost in reinforcement concrete structures. It is also one of the labor intensity tasks. Reinforcement bar assembly is always on the critical path and has a great influence at the overall schedule. Traditional reinforcement bar assembly requires a great number of technicians in the field, great amount of re-bar bending and cutting, and plenty of supply and assembly. It will become an all kinds of wastes if the planning is improper, such as production surplus, manpower wastage, etc. Free thinking is so easy that everyone can do it. Its spirit is to free the current confinement and to break taboo. One may vitally consider the operations at every single step, seek the strategy of completing the target on the basis of work objective, and apply diverse techniques to carry it out. Finally, the goal will be achieved. Yeng-Horng Perng 彭雲宏 1999 學位論文 ; thesis 138 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣科技大學 === 營建工程系 === 87 === Many specialists are too professional to deem various hidden problems as abnornal. As a result, many opportunities of solving problems are lost and numerous wastes are resulted. The wastes are invisible. They are burden of a company and are difficult to be noticed and/or discovered. Eventually, the company becomes lack of vitality. The study applies the free thinking concept on the basis of productivity analysis and the foundation of JIT(Just in time) theory. It also provides the strategy of waste prevention for all the individual cases. According to the investigations, the cost for reinforcement bar assembly is one of the four construction tasks with high cost in reinforcement concrete structures. It is also one of the labor intensity tasks. Reinforcement bar assembly is always on the critical path and has a great influence at the overall schedule. Traditional reinforcement bar assembly requires a great number of technicians in the field, great amount of re-bar bending and cutting, and plenty of supply and assembly. It will become an all kinds of wastes if the planning is improper, such as production surplus, manpower wastage, etc. Free thinking is so easy that everyone can do it. Its spirit is to free the current confinement and to break taboo. One may vitally consider the operations at every single step, seek the strategy of completing the target on the basis of work objective, and apply diverse techniques to carry it out. Finally, the goal will be achieved.
author2 Yeng-Horng Perng
author_facet Yeng-Horng Perng
Yu-Lien Chang
張玉連
author Yu-Lien Chang
張玉連
spellingShingle Yu-Lien Chang
張玉連
Task of Reinforcement Bar Redesign
author_sort Yu-Lien Chang
title Task of Reinforcement Bar Redesign
title_short Task of Reinforcement Bar Redesign
title_full Task of Reinforcement Bar Redesign
title_fullStr Task of Reinforcement Bar Redesign
title_full_unstemmed Task of Reinforcement Bar Redesign
title_sort task of reinforcement bar redesign
publishDate 1999
url http://ndltd.ncl.edu.tw/handle/47261557062707992019
work_keys_str_mv AT yulienchang taskofreinforcementbarredesign
AT zhāngyùlián taskofreinforcementbarredesign
AT yulienchang gāngjīnzuòyèzhòngxīnshèjì
AT zhāngyùlián gāngjīnzuòyèzhòngxīnshèjì
_version_ 1718175120183263232