The Integrated Circuit Packaging Scheduling Problem
碩士 === 國立交通大學 === 工業工程與管理系 === 88 === The integrated circuit packaging scheduling problem (ICPSP) is a variation of the flexible flow-shop scheduling problem, which is also a generalization of the classical flow-shop and the identical parallel-machine problems. In the integrated circuit (IC) packag...
Main Authors: | Chiao-Yi Chen, 陳巧頤 |
---|---|
Other Authors: | Wen-Lea Pearn |
Format: | Others |
Language: | en_US |
Published: |
2000
|
Online Access: | http://ndltd.ncl.edu.tw/handle/70176953994726557975 |
Similar Items
-
Algorithms-based solution for multi-stage integrated circuit packaging scheduling problem
by: Yung-Hsuan Chen, et al.
Published: (2003) -
The Integrated Circuit Final Testing Scheduling Problem
by: An-Yi Chen, et al.
Published: (2001) -
The Thermal Analysis of Integrated Circuit Package
by: Yi-Chen Yen, et al.
Published: (2000) -
ELECTRICAL CHARACTERISTICS OF INTEGRATED CIRCUIT PACKAGES
by: Senthinathan, Ramesh, 1961-
Published: (1987) -
Dynamic Load Route Scheduling Problem in Tandem AGVS
by: Lin, Chiao-Win, et al.
Published: (1994)