Evaluating a BOT project with fuzzy multiple objective programming
碩士 === 國立臺灣科技大學 === 營建工程系 === 88 === The study is to construct the concession company selection index (CCSI) of BOT (Build-Operation-Transfer) projects as a guide when evaluating a BOT project. We use fuzzy multiple objective programming (FMOP) to obtain the gauge of CCSI. In the research FMOP is tr...
Main Authors: | Hao-Chun Chen, 陳豪鈞 |
---|---|
Other Authors: | Ching-Hwang Wang |
Format: | Others |
Language: | zh-TW |
Published: |
2000
|
Online Access: | http://ndltd.ncl.edu.tw/handle/09383591607686276553 |
Similar Items
-
Multi-objective genetic algorithm for BOT project design problem
by: Wei-Zhi Chen, et al.
Published: (2009) -
Operation Evaluation Model for Transportation BOT Project - Using Fuzzy Theory
by: Chien-Long Luo, et al.
Published: (2000) -
BOT Project Evaluation and Risk Analysis
by: Woan- Chien Wei, et al.
Published: (2006) -
A Financial Evaluation Framework of Cost Risk for BOT Projects
by: Chen, Chinjoe, et al.
Published: (1996) -
Study on Project Decision with Modified Multiple Fuzzy Objective Linear Programming
by: Wei-Yuan Chiu, et al.
Published: (2010)