Dynamic Integrated product control system
碩士 === 國立雲林科技大學 === 工業工程與管理研究所 === 88 === During the normal production run, potentially, factories can experience unexpected conditions like quantity or delivery date changes by customers and mechanical malfunction. At the very moment, if there’s no existing back up production procedure and scheduli...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2000
|
Online Access: | http://ndltd.ncl.edu.tw/handle/66912810574601966365 |
id |
ndltd-TW-088YUNTE031002 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-088YUNTE0310022016-01-29T04:19:39Z http://ndltd.ncl.edu.tw/handle/66912810574601966365 Dynamic Integrated product control system 機動整合生產控制系統之規劃研究 Chung-Shun Hsiao 蕭慶舜 碩士 國立雲林科技大學 工業工程與管理研究所 88 During the normal production run, potentially, factories can experience unexpected conditions like quantity or delivery date changes by customers and mechanical malfunction. At the very moment, if there’s no existing back up production procedure and scheduling, then the production may well be stopped and the delivery schedule will also be delayed. For solving these kinds of unexpected conditions, this research introduced the “ Dynamic Integrated Product Control System” for coping and integrating both the normal-production-influencing machinery condition and customer orders. And with minimal total production cost as the premise, we set up the production procedure and scheduling based on the Dynamic Integrated Process Planning and Scheduling Algorithm. (DIPS) The DIPS based on the Genetic Algorithm (GA) with dynamic machine and order condition as the control factors to solve for problems in determining production procedures and scheduling. While on the evaluation of performance, this research used the statistical optimization technique for auditing the solution quality of DIPS algorithm. As for the performance evaluation, we conducted a simulation experiment. The performance evaluation indicators were the total cost after production planning and production scheduling and the CPU time. The results had shown great effects in both the solution quality and performance evaluation Chun-wei R.Lin 林君維 2000 學位論文 ; thesis 93 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立雲林科技大學 === 工業工程與管理研究所 === 88 === During the normal production run, potentially, factories can experience unexpected conditions like quantity or delivery date changes by customers and mechanical malfunction. At the very moment, if there’s no existing back up production procedure and scheduling, then the production may well be stopped and the delivery schedule will also be delayed.
For solving these kinds of unexpected conditions, this research introduced the “ Dynamic Integrated Product Control System” for coping and integrating both the normal-production-influencing machinery condition and customer orders. And with minimal total production cost as the premise, we set up the production procedure and scheduling based on the Dynamic Integrated Process Planning and Scheduling Algorithm. (DIPS) The DIPS based on the Genetic Algorithm (GA) with dynamic machine and order condition as the control factors to solve for problems in determining production procedures and scheduling. While on the evaluation of performance, this research used the statistical optimization technique for auditing the solution quality of DIPS algorithm. As for the performance evaluation, we conducted a simulation experiment. The performance evaluation indicators were the total cost after production planning and production scheduling and the CPU time. The results had shown great effects in both the solution quality and performance evaluation
|
author2 |
Chun-wei R.Lin |
author_facet |
Chun-wei R.Lin Chung-Shun Hsiao 蕭慶舜 |
author |
Chung-Shun Hsiao 蕭慶舜 |
spellingShingle |
Chung-Shun Hsiao 蕭慶舜 Dynamic Integrated product control system |
author_sort |
Chung-Shun Hsiao |
title |
Dynamic Integrated product control system |
title_short |
Dynamic Integrated product control system |
title_full |
Dynamic Integrated product control system |
title_fullStr |
Dynamic Integrated product control system |
title_full_unstemmed |
Dynamic Integrated product control system |
title_sort |
dynamic integrated product control system |
publishDate |
2000 |
url |
http://ndltd.ncl.edu.tw/handle/66912810574601966365 |
work_keys_str_mv |
AT chungshunhsiao dynamicintegratedproductcontrolsystem AT xiāoqìngshùn dynamicintegratedproductcontrolsystem AT chungshunhsiao jīdòngzhěnghéshēngchǎnkòngzhìxìtǒngzhīguīhuàyánjiū AT xiāoqìngshùn jīdòngzhěnghéshēngchǎnkòngzhìxìtǒngzhīguīhuàyánjiū |
_version_ |
1718169458683412480 |