Constructing a Process Reference Model of Electronic Procurement-Using a Medical Center as an Example

碩士 === 長庚大學 === 企業管理研究所 === 89 === With the environments changing, the ability of quick response and speeding the innovation has become the mainstreams of nowadays in most companies. Along with the development of internet these years, the usage of Business to Business Electronic Commerce(B2B)are als...

Full description

Bibliographic Details
Main Authors: Allen Shih, 施志豪
Other Authors: 王福琨
Format: Others
Language:zh-TW
Published: 2001
Online Access:http://ndltd.ncl.edu.tw/handle/34871599629898265800
id ndltd-TW-089CGU00121006
record_format oai_dc
spelling ndltd-TW-089CGU001210062016-06-13T04:16:11Z http://ndltd.ncl.edu.tw/handle/34871599629898265800 Constructing a Process Reference Model of Electronic Procurement-Using a Medical Center as an Example 建構一電子採購流程參考模型-以某醫學中心的電子採購流程為例 Allen Shih 施志豪 碩士 長庚大學 企業管理研究所 89 With the environments changing, the ability of quick response and speeding the innovation has become the mainstreams of nowadays in most companies. Along with the development of internet these years, the usage of Business to Business Electronic Commerce(B2B)are also valued. According to the prediction about the B2B long-term market by Gartner, Inc, the sum of B2B transaction exceeds 433 hundred billions, and will up to 8,530 billions in 2005. But before attending the B2B transaction, corporate needs to precede the Business Process Reengineering(BPR in short). The purpose of this study is to explore the processes of electronic procurement of hospitals’ direct materials, thus we can build a practice reference model for electrical buyers’. At the mean time, we evaluate the cycle time of the whole processes. The method of processes modeling is to decompose the electronic procurement process to the aspect of organization view, data view and function view. Then we use the control view to integrate every parts into a complete process architecture by eEPC diagram and analyze the process by the ARIS tool software to compare the efficiency under different scenarios. From the case data, we have the average time to complete electronic procurement by the contract is about 10 days, which is about 28 to 33 days by a non-contract. Analyzing the key processes by this research, we suggest that case hospitals could use the inventory control systems to predict the time and quantity of next procurement run and inform the suppliers. According to the results of ARIS analysis, the average of procurement times deducts 53.33% of the original、the average turnover rate of inventory increase 14.28% of the original, and the average inventory cost of hospitals decrease. 王福琨 李文義 2001 學位論文 ; thesis 81 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 長庚大學 === 企業管理研究所 === 89 === With the environments changing, the ability of quick response and speeding the innovation has become the mainstreams of nowadays in most companies. Along with the development of internet these years, the usage of Business to Business Electronic Commerce(B2B)are also valued. According to the prediction about the B2B long-term market by Gartner, Inc, the sum of B2B transaction exceeds 433 hundred billions, and will up to 8,530 billions in 2005. But before attending the B2B transaction, corporate needs to precede the Business Process Reengineering(BPR in short). The purpose of this study is to explore the processes of electronic procurement of hospitals’ direct materials, thus we can build a practice reference model for electrical buyers’. At the mean time, we evaluate the cycle time of the whole processes. The method of processes modeling is to decompose the electronic procurement process to the aspect of organization view, data view and function view. Then we use the control view to integrate every parts into a complete process architecture by eEPC diagram and analyze the process by the ARIS tool software to compare the efficiency under different scenarios. From the case data, we have the average time to complete electronic procurement by the contract is about 10 days, which is about 28 to 33 days by a non-contract. Analyzing the key processes by this research, we suggest that case hospitals could use the inventory control systems to predict the time and quantity of next procurement run and inform the suppliers. According to the results of ARIS analysis, the average of procurement times deducts 53.33% of the original、the average turnover rate of inventory increase 14.28% of the original, and the average inventory cost of hospitals decrease.
author2 王福琨
author_facet 王福琨
Allen Shih
施志豪
author Allen Shih
施志豪
spellingShingle Allen Shih
施志豪
Constructing a Process Reference Model of Electronic Procurement-Using a Medical Center as an Example
author_sort Allen Shih
title Constructing a Process Reference Model of Electronic Procurement-Using a Medical Center as an Example
title_short Constructing a Process Reference Model of Electronic Procurement-Using a Medical Center as an Example
title_full Constructing a Process Reference Model of Electronic Procurement-Using a Medical Center as an Example
title_fullStr Constructing a Process Reference Model of Electronic Procurement-Using a Medical Center as an Example
title_full_unstemmed Constructing a Process Reference Model of Electronic Procurement-Using a Medical Center as an Example
title_sort constructing a process reference model of electronic procurement-using a medical center as an example
publishDate 2001
url http://ndltd.ncl.edu.tw/handle/34871599629898265800
work_keys_str_mv AT allenshih constructingaprocessreferencemodelofelectronicprocurementusingamedicalcenterasanexample
AT shīzhìháo constructingaprocessreferencemodelofelectronicprocurementusingamedicalcenterasanexample
AT allenshih jiàngòuyīdiànzicǎigòuliúchéngcānkǎomóxíngyǐmǒuyīxuézhōngxīndediànzicǎigòuliúchéngwèilì
AT shīzhìháo jiàngòuyīdiànzicǎigòuliúchéngcānkǎomóxíngyǐmǒuyīxuézhōngxīndediànzicǎigòuliúchéngwèilì
_version_ 1718302008747753472