Real Time Management of Non-Value Added Activities in IC Foundries
碩士 === 國立交通大學 === 工業工程與管理系 === 89 === Due to the complexity of semiconductor manufacturing and the unexpected occurrence of undesirable events in the fabrication, it is not easy to manage the production cycle time. Usually, the management method is by releasing and dispatching. These methods need m...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2001
|
Online Access: | http://ndltd.ncl.edu.tw/handle/40416825820327943184 |
id |
ndltd-TW-089NCTU0031026 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-089NCTU00310262016-01-29T04:27:57Z http://ndltd.ncl.edu.tw/handle/40416825820327943184 Real Time Management of Non-Value Added Activities in IC Foundries 晶圓代工廠無附加價值活動之即時管理系統 Tony Chu 朱文東 碩士 國立交通大學 工業工程與管理系 89 Due to the complexity of semiconductor manufacturing and the unexpected occurrence of undesirable events in the fabrication, it is not easy to manage the production cycle time. Usually, the management method is by releasing and dispatching. These methods need much time to analyze data, and usually can not effectively manage the fabrication in time. The purpose of this research is to construct a management mechanism for cycle time reduction. The method is by real time monitoring the difference between target cycle time and actual cycle time. According to the “time difference”, the monitor system will detect every possible delayed lots and order to correct the undesirable events. Then, the real time monitor system will send alarm information to the people who is responsible for the corrective action. According to the simulation result, this monitor system can provide the manager real time information to manage the fabrication well. Muh-Cherng Wu Hsi-Mei Hsu 巫木誠 許錫美 2001 學位論文 ; thesis 70 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立交通大學 === 工業工程與管理系 === 89 === Due to the complexity of semiconductor manufacturing and the unexpected occurrence of undesirable events in the fabrication, it is not easy to manage the production cycle time. Usually, the management method is by releasing and dispatching. These methods need much time to analyze data, and usually can not effectively manage the fabrication in time.
The purpose of this research is to construct a management mechanism for cycle time reduction. The method is by real time monitoring the difference between target cycle time and actual cycle time. According to the “time difference”, the monitor system will detect every possible delayed lots and order to correct the undesirable events. Then, the real time monitor system will send alarm information to the people who is responsible for the corrective action. According to the simulation result, this monitor system can provide the manager real time information to manage the fabrication well.
|
author2 |
Muh-Cherng Wu |
author_facet |
Muh-Cherng Wu Tony Chu 朱文東 |
author |
Tony Chu 朱文東 |
spellingShingle |
Tony Chu 朱文東 Real Time Management of Non-Value Added Activities in IC Foundries |
author_sort |
Tony Chu |
title |
Real Time Management of Non-Value Added Activities in IC Foundries |
title_short |
Real Time Management of Non-Value Added Activities in IC Foundries |
title_full |
Real Time Management of Non-Value Added Activities in IC Foundries |
title_fullStr |
Real Time Management of Non-Value Added Activities in IC Foundries |
title_full_unstemmed |
Real Time Management of Non-Value Added Activities in IC Foundries |
title_sort |
real time management of non-value added activities in ic foundries |
publishDate |
2001 |
url |
http://ndltd.ncl.edu.tw/handle/40416825820327943184 |
work_keys_str_mv |
AT tonychu realtimemanagementofnonvalueaddedactivitiesinicfoundries AT zhūwéndōng realtimemanagementofnonvalueaddedactivitiesinicfoundries AT tonychu jīngyuándàigōngchǎngwúfùjiājiàzhíhuódòngzhījíshíguǎnlǐxìtǒng AT zhūwéndōng jīngyuándàigōngchǎngwúfùjiājiàzhíhuódòngzhījíshíguǎnlǐxìtǒng |
_version_ |
1718170624326631424 |