Real Time Management of Non-Value Added Activities in IC Foundries

碩士 === 國立交通大學 === 工業工程與管理系 === 89 === Due to the complexity of semiconductor manufacturing and the unexpected occurrence of undesirable events in the fabrication, it is not easy to manage the production cycle time. Usually, the management method is by releasing and dispatching. These methods need m...

Full description

Bibliographic Details
Main Authors: Tony Chu, 朱文東
Other Authors: Muh-Cherng Wu
Format: Others
Language:zh-TW
Published: 2001
Online Access:http://ndltd.ncl.edu.tw/handle/40416825820327943184
id ndltd-TW-089NCTU0031026
record_format oai_dc
spelling ndltd-TW-089NCTU00310262016-01-29T04:27:57Z http://ndltd.ncl.edu.tw/handle/40416825820327943184 Real Time Management of Non-Value Added Activities in IC Foundries 晶圓代工廠無附加價值活動之即時管理系統 Tony Chu 朱文東 碩士 國立交通大學 工業工程與管理系 89 Due to the complexity of semiconductor manufacturing and the unexpected occurrence of undesirable events in the fabrication, it is not easy to manage the production cycle time. Usually, the management method is by releasing and dispatching. These methods need much time to analyze data, and usually can not effectively manage the fabrication in time. The purpose of this research is to construct a management mechanism for cycle time reduction. The method is by real time monitoring the difference between target cycle time and actual cycle time. According to the “time difference”, the monitor system will detect every possible delayed lots and order to correct the undesirable events. Then, the real time monitor system will send alarm information to the people who is responsible for the corrective action. According to the simulation result, this monitor system can provide the manager real time information to manage the fabrication well. Muh-Cherng Wu Hsi-Mei Hsu 巫木誠 許錫美 2001 學位論文 ; thesis 70 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立交通大學 === 工業工程與管理系 === 89 === Due to the complexity of semiconductor manufacturing and the unexpected occurrence of undesirable events in the fabrication, it is not easy to manage the production cycle time. Usually, the management method is by releasing and dispatching. These methods need much time to analyze data, and usually can not effectively manage the fabrication in time. The purpose of this research is to construct a management mechanism for cycle time reduction. The method is by real time monitoring the difference between target cycle time and actual cycle time. According to the “time difference”, the monitor system will detect every possible delayed lots and order to correct the undesirable events. Then, the real time monitor system will send alarm information to the people who is responsible for the corrective action. According to the simulation result, this monitor system can provide the manager real time information to manage the fabrication well.
author2 Muh-Cherng Wu
author_facet Muh-Cherng Wu
Tony Chu
朱文東
author Tony Chu
朱文東
spellingShingle Tony Chu
朱文東
Real Time Management of Non-Value Added Activities in IC Foundries
author_sort Tony Chu
title Real Time Management of Non-Value Added Activities in IC Foundries
title_short Real Time Management of Non-Value Added Activities in IC Foundries
title_full Real Time Management of Non-Value Added Activities in IC Foundries
title_fullStr Real Time Management of Non-Value Added Activities in IC Foundries
title_full_unstemmed Real Time Management of Non-Value Added Activities in IC Foundries
title_sort real time management of non-value added activities in ic foundries
publishDate 2001
url http://ndltd.ncl.edu.tw/handle/40416825820327943184
work_keys_str_mv AT tonychu realtimemanagementofnonvalueaddedactivitiesinicfoundries
AT zhūwéndōng realtimemanagementofnonvalueaddedactivitiesinicfoundries
AT tonychu jīngyuándàigōngchǎngwúfùjiājiàzhíhuódòngzhījíshíguǎnlǐxìtǒng
AT zhūwéndōng jīngyuándàigōngchǎngwúfùjiājiàzhíhuódòngzhījíshíguǎnlǐxìtǒng
_version_ 1718170624326631424