污水下水道短管推進工法以即時性管控落實監造

碩士 === 國立中央大學 === 土木工程研究所 === 89 === Microtunneling method has become the unique choice for connecting the underground sewer mains and households. Microtunneling is versatile and robust is snaking around existing pipelines already crowded in urban areas. However, construction quality is an imminen...

Full description

Bibliographic Details
Main Authors: CHIN-CHIEN CHOU, 周志堅
Other Authors: TING-YA HSIEH
Format: Others
Language:zh-TW
Published: 2001
Online Access:http://ndltd.ncl.edu.tw/handle/29933478466065673125
id ndltd-TW-089NCU00015025
record_format oai_dc
spelling ndltd-TW-089NCU000150252016-06-13T04:16:12Z http://ndltd.ncl.edu.tw/handle/29933478466065673125 污水下水道短管推進工法以即時性管控落實監造 CHIN-CHIEN CHOU 周志堅 碩士 國立中央大學 土木工程研究所 89 Microtunneling method has become the unique choice for connecting the underground sewer mains and households. Microtunneling is versatile and robust is snaking around existing pipelines already crowded in urban areas. However, construction quality is an imminent problem in microtunneling, since supervision of underground work remains both costly and ineffective. Common quality defects in sewer pipe construction include leakage in connections, poor slope control and road collapse due to excavation.. These defects either create safety issues to the public as well as the workers or risk shortening the life of sewer pipes. Tackling these problems will require great effort in work supervision.. However, supervising underground work usually consumes more technical manpower than sewer systems owner can afford. This study provide a new paradigm in underground work supervision.. A real-time construction work supervision procedure is proposed. The procedure bases its effectiveness upon wireless communication. First, the work is videotaped in a digital format. Detailed videotaping procedures are given.. The visual output is then transmitted via wireless communication tools, such a PHS or GPS mobile phone, to a central website. The website operator will inventory the arriving files according to a pre-determined file management system. With this procedure, site supervisors can monitor more sites with less effort. Personal visits will be directed to construction sites which reveal particular concerns. This work has proven the procedure feasible and tentative estimates also verify its cost effectiveness. Keywords: Sewer pipe construction, wireless communication, construction management, productivity. TING-YA HSIEH 謝定亞 2001 學位論文 ; thesis 76 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中央大學 === 土木工程研究所 === 89 === Microtunneling method has become the unique choice for connecting the underground sewer mains and households. Microtunneling is versatile and robust is snaking around existing pipelines already crowded in urban areas. However, construction quality is an imminent problem in microtunneling, since supervision of underground work remains both costly and ineffective. Common quality defects in sewer pipe construction include leakage in connections, poor slope control and road collapse due to excavation.. These defects either create safety issues to the public as well as the workers or risk shortening the life of sewer pipes. Tackling these problems will require great effort in work supervision.. However, supervising underground work usually consumes more technical manpower than sewer systems owner can afford. This study provide a new paradigm in underground work supervision.. A real-time construction work supervision procedure is proposed. The procedure bases its effectiveness upon wireless communication. First, the work is videotaped in a digital format. Detailed videotaping procedures are given.. The visual output is then transmitted via wireless communication tools, such a PHS or GPS mobile phone, to a central website. The website operator will inventory the arriving files according to a pre-determined file management system. With this procedure, site supervisors can monitor more sites with less effort. Personal visits will be directed to construction sites which reveal particular concerns. This work has proven the procedure feasible and tentative estimates also verify its cost effectiveness. Keywords: Sewer pipe construction, wireless communication, construction management, productivity.
author2 TING-YA HSIEH
author_facet TING-YA HSIEH
CHIN-CHIEN CHOU
周志堅
author CHIN-CHIEN CHOU
周志堅
spellingShingle CHIN-CHIEN CHOU
周志堅
污水下水道短管推進工法以即時性管控落實監造
author_sort CHIN-CHIEN CHOU
title 污水下水道短管推進工法以即時性管控落實監造
title_short 污水下水道短管推進工法以即時性管控落實監造
title_full 污水下水道短管推進工法以即時性管控落實監造
title_fullStr 污水下水道短管推進工法以即時性管控落實監造
title_full_unstemmed 污水下水道短管推進工法以即時性管控落實監造
title_sort 污水下水道短管推進工法以即時性管控落實監造
publishDate 2001
url http://ndltd.ncl.edu.tw/handle/29933478466065673125
work_keys_str_mv AT chinchienchou wūshuǐxiàshuǐdàoduǎnguǎntuījìngōngfǎyǐjíshíxìngguǎnkòngluòshíjiānzào
AT zhōuzhìjiān wūshuǐxiàshuǐdàoduǎnguǎntuījìngōngfǎyǐjíshíxìngguǎnkòngluòshíjiānzào
_version_ 1718302073779388416