Lessons Learned From a Multiphase Fast-Track Project: The Case of Mei Lao Petrochemical Plant

碩士 === 國立高雄第一科技大學 === 營建工程系 === 89 === Lessons Learned From a Multiphase Fast—Track Project: The Case of Mei Lao Petrochemical Petrochemical Plant Student:Huang, Kun-Lin            Advisors. Dr. Lo, wei Department of construction Engineering Nati...

Full description

Bibliographic Details
Main Authors: Kun-Lin Huang, 黃錕琳
Other Authors: Wei Lo
Format: Others
Language:zh-TW
Published: 2001
Online Access:http://ndltd.ncl.edu.tw/handle/17063916063234264131
id ndltd-TW-089NKIT0512004
record_format oai_dc
spelling ndltd-TW-089NKIT05120042016-01-29T04:28:38Z http://ndltd.ncl.edu.tw/handle/17063916063234264131 Lessons Learned From a Multiphase Fast-Track Project: The Case of Mei Lao Petrochemical Plant 併行作業應用於大型建廠工程之研究--以台塑麥寮石化廠為例 Kun-Lin Huang 黃錕琳 碩士 國立高雄第一科技大學 營建工程系 89 Lessons Learned From a Multiphase Fast—Track Project: The Case of Mei Lao Petrochemical Petrochemical Plant Student:Huang, Kun-Lin            Advisors. Dr. Lo, wei Department of construction Engineering National Kaohsiung First University of Science and Technology ABSTRACT In order to obtain an early return of the huge amount of the investment resulted from the increasing complexity and size of a construction project. In addition to the four common resources, materials, manpower, machines, and money, time has drawn more and more attention in the recent years. There are many ways to shorten the project time. Especially, in designing new construction phases of the project life cycle. Many efforts have been made in creating new design concepts, finding new construction methods, or producing new materials. However, only limited improvements were found on certain work items and little effect was shown on the overall project schedule. Fast track method is a way to compress the project schedule by overlapping activities that are normally handled sequentially. Previous studies have implied that fast track method can shorten a considerate amount of project time and most investors appreciate the results that allow an early return on their investments. However, there are few written evidences due to the limited number of study samples. This research is designed to use a huge petrochemical project, Mei Lao petrochemical plant, as the study sample, research will be focused on three parts: (a) the contractor selection process, (b) the organization and project control system and its mechanism with the contractors, and (c) the evaluation of the project in terms of time and cost. Conclusions will be built upon the analysis of the data collected from the written documents and information gleaned from interviews of the people involved in the project. Key words : Fast Tracking, Contractual Approach, Economic Evaluation. Wei Lo 羅維 2001 學位論文 ; thesis 121 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄第一科技大學 === 營建工程系 === 89 === Lessons Learned From a Multiphase Fast—Track Project: The Case of Mei Lao Petrochemical Petrochemical Plant Student:Huang, Kun-Lin            Advisors. Dr. Lo, wei Department of construction Engineering National Kaohsiung First University of Science and Technology ABSTRACT In order to obtain an early return of the huge amount of the investment resulted from the increasing complexity and size of a construction project. In addition to the four common resources, materials, manpower, machines, and money, time has drawn more and more attention in the recent years. There are many ways to shorten the project time. Especially, in designing new construction phases of the project life cycle. Many efforts have been made in creating new design concepts, finding new construction methods, or producing new materials. However, only limited improvements were found on certain work items and little effect was shown on the overall project schedule. Fast track method is a way to compress the project schedule by overlapping activities that are normally handled sequentially. Previous studies have implied that fast track method can shorten a considerate amount of project time and most investors appreciate the results that allow an early return on their investments. However, there are few written evidences due to the limited number of study samples. This research is designed to use a huge petrochemical project, Mei Lao petrochemical plant, as the study sample, research will be focused on three parts: (a) the contractor selection process, (b) the organization and project control system and its mechanism with the contractors, and (c) the evaluation of the project in terms of time and cost. Conclusions will be built upon the analysis of the data collected from the written documents and information gleaned from interviews of the people involved in the project. Key words : Fast Tracking, Contractual Approach, Economic Evaluation.
author2 Wei Lo
author_facet Wei Lo
Kun-Lin Huang
黃錕琳
author Kun-Lin Huang
黃錕琳
spellingShingle Kun-Lin Huang
黃錕琳
Lessons Learned From a Multiphase Fast-Track Project: The Case of Mei Lao Petrochemical Plant
author_sort Kun-Lin Huang
title Lessons Learned From a Multiphase Fast-Track Project: The Case of Mei Lao Petrochemical Plant
title_short Lessons Learned From a Multiphase Fast-Track Project: The Case of Mei Lao Petrochemical Plant
title_full Lessons Learned From a Multiphase Fast-Track Project: The Case of Mei Lao Petrochemical Plant
title_fullStr Lessons Learned From a Multiphase Fast-Track Project: The Case of Mei Lao Petrochemical Plant
title_full_unstemmed Lessons Learned From a Multiphase Fast-Track Project: The Case of Mei Lao Petrochemical Plant
title_sort lessons learned from a multiphase fast-track project: the case of mei lao petrochemical plant
publishDate 2001
url http://ndltd.ncl.edu.tw/handle/17063916063234264131
work_keys_str_mv AT kunlinhuang lessonslearnedfromamultiphasefasttrackprojectthecaseofmeilaopetrochemicalplant
AT huángkūnlín lessonslearnedfromamultiphasefasttrackprojectthecaseofmeilaopetrochemicalplant
AT kunlinhuang bìngxíngzuòyèyīngyòngyúdàxíngjiànchǎnggōngchéngzhīyánjiūyǐtáisùmàiliáoshíhuàchǎngwèilì
AT huángkūnlín bìngxíngzuòyèyīngyòngyúdàxíngjiànchǎnggōngchéngzhīyánjiūyǐtáisùmàiliáoshíhuàchǎngwèilì
_version_ 1718172356469325824