Lessons Learned From a Multiphase Fast-Track Project: The Case of Mei Lao Petrochemical Plant
碩士 === 國立高雄第一科技大學 === 營建工程系 === 89 === Lessons Learned From a Multiphase Fast—Track Project: The Case of Mei Lao Petrochemical Petrochemical Plant Student:Huang, Kun-Lin Advisors. Dr. Lo, wei Department of construction Engineering Nati...
Main Authors: | Kun-Lin Huang, 黃錕琳 |
---|---|
Other Authors: | Wei Lo |
Format: | Others |
Language: | zh-TW |
Published: |
2001
|
Online Access: | http://ndltd.ncl.edu.tw/handle/17063916063234264131 |
Similar Items
-
Lessons Learned by the Strong Local Earthquake at the Petrochemical Plant
by: Y. Wada, et al.
Published: (2013-05-01) -
Lessons Learned from An Urban River Restoration Project in Lao-Jie River
by: Yu-hsienYang, et al.
Published: (2014) -
A Research on Project Management of Petrochemical plant''s Design-Build Contracts
by: Chih-Chiang Huang, et al.
Published: (2002) -
The Dispersion Simulation Analysis for The Leakage of Chemicals Tank in Petrochemical Plant.------An Example Petrochemical Plant
by: Shao-Fang Huang, et al.
Published: (2009) -
THE VALUE OF LEARNING OPTIONS IN A PETROCHEMICAL INVESTMENT PROJECT
by: CLARISSA PALU CORREA