Simulation of NATM Tunneling Construction:Example of Ba-Guah Mountain Tunnel
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 90 === Construction processes are complex operations that include the uses of equipment, materials, crews and geological conditions. Simulation can be used to study these processes in order to make competent decisions that will lower costs and shorten the duration of...
Main Authors: | Chin-Tsang Lin, 林志蒼 |
---|---|
Other Authors: | Tao-Ming Cheng |
Format: | Others |
Language: | zh-TW |
Published: |
2002
|
Online Access: | http://ndltd.ncl.edu.tw/handle/33349872080314975392 |
Similar Items
-
CASE STUDY OF BA-GUAH-SHAN GRAVEL TUNNEL PROGRESSING RATE
by: Wei-Ming Hwang, et al.
Published: (2002) -
The Research on the Operating Performance Assessment for the Automatic Incident Detection System of the Highway Tunnel-as an Example of Ba-Guah-Shen Tunnel
by: Tai-Chien Wang, et al.
Published: (2008) -
Analysis of Production Rate for NATM Tunneling Construction
by: Meng-Chieh Lin, et al.
Published: (2003) -
A study on the assessment of carrying perilous goods to pass highway long tunnel― Ba-Guah-Shan long tunnel as an illustrative example
by: Ton-mei Lee, et al.
Published: (2007) -
Deformation of The Soil Tunnel by the NATM
by: Che-Chun Su, et al.
Published: (2008)