Quality Management Study of Information System Testing— An Example of “Joint Logistic Information System” Load Testing
碩士 === 國防管理學院 === 國防資訊研究所 === 90 === The purpose of information system testing is to find errors and defects as soon as possible and enhance system reliabilities. It is one of the most important and complicated works of system life cycles. There are some defects may not be able to detect...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2002
|
Online Access: | http://ndltd.ncl.edu.tw/handle/64252554660667977511 |
id |
ndltd-TW-090NDMC1654019 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-090NDMC16540192015-10-13T10:17:27Z http://ndltd.ncl.edu.tw/handle/64252554660667977511 Quality Management Study of Information System Testing— An Example of “Joint Logistic Information System” Load Testing 資訊系統測試作業的品質管理之研究-以『聯合後勤資訊系統』負載測試為例 Lu Chin-Chuan 盧金釧 碩士 國防管理學院 國防資訊研究所 90 The purpose of information system testing is to find errors and defects as soon as possible and enhance system reliabilities. It is one of the most important and complicated works of system life cycles. There are some defects may not be able to detect due to not enough testing or poor testing. It means that users have to take those risks by themselves, however, over testing might waste a lot of resource and money. The management department is not happy to see which the poor testing and over testing have been done. To pursue a high quality of information system, an appropriate testing is the essential job to make sure testing quality. This study takes quality management as a view to do the information system testing and also combines with W. Edwards Deming and Philips B. Crosby’s management philosophy of testing in order to set up a quality management structure of information system testing. This study has been done with “Joint Logistic Information System” load testing. A quality management structure of information system testing is proposed to execute testing management and achieves the testing goal. It not only helps development department to find the operation bottleneck for system and understand the main cause of problems but also helps to improve system structures and give high level management department and users’ confidences. This is a great contribution for the Military Logistic Information Operation. Chu Huey-Der 朱慧德 2002 學位論文 ; thesis 97 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國防管理學院 === 國防資訊研究所 === 90 === The purpose of information system testing is to find errors and defects as soon as possible and enhance system reliabilities. It is one of the most important and complicated works of system life cycles. There are some defects may not be able to detect due to not enough testing or poor testing. It means that users have to take those risks by themselves, however, over testing might waste a lot of resource and money. The management department is not happy to see which the poor testing and over testing have been done. To pursue a high quality of information system, an appropriate testing is the essential job to make sure testing quality.
This study takes quality management as a view to do the information system testing and also combines with W. Edwards Deming and Philips B. Crosby’s management philosophy of testing in order to set up a quality management structure of information system testing.
This study has been done with “Joint Logistic Information System” load testing. A quality management structure of information system testing is proposed to execute testing management and achieves the testing goal. It not only helps development department to find the operation bottleneck for system and understand the main cause of problems but also helps to improve system structures and give high level management department and users’ confidences. This is a great contribution for the Military Logistic Information Operation.
|
author2 |
Chu Huey-Der |
author_facet |
Chu Huey-Der Lu Chin-Chuan 盧金釧 |
author |
Lu Chin-Chuan 盧金釧 |
spellingShingle |
Lu Chin-Chuan 盧金釧 Quality Management Study of Information System Testing— An Example of “Joint Logistic Information System” Load Testing |
author_sort |
Lu Chin-Chuan |
title |
Quality Management Study of Information System Testing— An Example of “Joint Logistic Information System” Load Testing |
title_short |
Quality Management Study of Information System Testing— An Example of “Joint Logistic Information System” Load Testing |
title_full |
Quality Management Study of Information System Testing— An Example of “Joint Logistic Information System” Load Testing |
title_fullStr |
Quality Management Study of Information System Testing— An Example of “Joint Logistic Information System” Load Testing |
title_full_unstemmed |
Quality Management Study of Information System Testing— An Example of “Joint Logistic Information System” Load Testing |
title_sort |
quality management study of information system testing— an example of “joint logistic information system” load testing |
publishDate |
2002 |
url |
http://ndltd.ncl.edu.tw/handle/64252554660667977511 |
work_keys_str_mv |
AT luchinchuan qualitymanagementstudyofinformationsystemtestinganexampleofjointlogisticinformationsystemloadtesting AT lújīnchuàn qualitymanagementstudyofinformationsystemtestinganexampleofjointlogisticinformationsystemloadtesting AT luchinchuan zīxùnxìtǒngcèshìzuòyèdepǐnzhìguǎnlǐzhīyánjiūyǐliánhéhòuqínzīxùnxìtǒngfùzàicèshìwèilì AT lújīnchuàn zīxùnxìtǒngcèshìzuòyèdepǐnzhìguǎnlǐzhīyánjiūyǐliánhéhòuqínzīxùnxìtǒngfùzàicèshìwèilì |
_version_ |
1716827735463034880 |