Single Machine Scheduling with Breakdown and Maintenance

博士 === 國立臺灣科技大學 === 工業管理系 === 90 === Most scheduling models assume that machines are available at all times. However, this assumption may not be true in real industrial settings. For example, a preventive maintenance activity is required or a machine breakdown occurs. In many industries, machine bre...

Full description

Bibliographic Details
Main Authors: Chen Wen-Jinn, 陳文進
Other Authors: 廖慶榮
Format: Others
Language:zh-TW
Published: 2002
Online Access:http://ndltd.ncl.edu.tw/handle/18018658154953019328
id ndltd-TW-090NTUST041054
record_format oai_dc
spelling ndltd-TW-090NTUST0410542015-10-13T14:41:12Z http://ndltd.ncl.edu.tw/handle/18018658154953019328 Single Machine Scheduling with Breakdown and Maintenance 單機故障與維修之排程研究 Chen Wen-Jinn 陳文進 博士 國立臺灣科技大學 工業管理系 90 Most scheduling models assume that machines are available at all times. However, this assumption may not be true in real industrial settings. For example, a preventive maintenance activity is required or a machine breakdown occurs. In many industries, machine breakdowns are found prevalently and make the shop behavior hard to predict, and thereby reducing the efficiency of the production system. Therefore, how to schedule maintenance to reduce the breakdown rate has been recognized by the decision makers. In this thesis, we address the single machine scheduling problem with breakdown and maintenance. In particular, three related problems are discussed as follows: 1.Based on the experience of the studied company, a longer idle time can reduce the breakdown rate when machine is running without stopping for a long period of time (i.e. a heavy load). Thus, a heuristic is proposed to maximize the total setup time (or the total idle time). The proposed heuristic is evaluated by using the branch-and-bound algorithm. 2.In many manufacturing systems, maintenance has been scheduled regularly or periodically. Therefore, we need to develop scheduling method to deal with systems with periodic maintenance. A heuristic is proposed to solve the scheduling problem with nonresumable jobs. The objective is to minimize the maximum tardiness subject to periodic maintenance. Computational results based on real industrial data are provided to demonstrate the effectiveness of the heuristic. 3.Under different maintenance circumstances, we develop six algorithms to improve the EDD method used by the studied company. The problem under consideration is to find a schedule that minimizes the number of tardiness jobs subject to one maintenance. The improvement ratios of the six algorithms are shown in this thesis. Computational results are provided to demonstrate the effectiveness of the algorithms. 廖慶榮 2002 學位論文 ; thesis 80 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 博士 === 國立臺灣科技大學 === 工業管理系 === 90 === Most scheduling models assume that machines are available at all times. However, this assumption may not be true in real industrial settings. For example, a preventive maintenance activity is required or a machine breakdown occurs. In many industries, machine breakdowns are found prevalently and make the shop behavior hard to predict, and thereby reducing the efficiency of the production system. Therefore, how to schedule maintenance to reduce the breakdown rate has been recognized by the decision makers. In this thesis, we address the single machine scheduling problem with breakdown and maintenance. In particular, three related problems are discussed as follows: 1.Based on the experience of the studied company, a longer idle time can reduce the breakdown rate when machine is running without stopping for a long period of time (i.e. a heavy load). Thus, a heuristic is proposed to maximize the total setup time (or the total idle time). The proposed heuristic is evaluated by using the branch-and-bound algorithm. 2.In many manufacturing systems, maintenance has been scheduled regularly or periodically. Therefore, we need to develop scheduling method to deal with systems with periodic maintenance. A heuristic is proposed to solve the scheduling problem with nonresumable jobs. The objective is to minimize the maximum tardiness subject to periodic maintenance. Computational results based on real industrial data are provided to demonstrate the effectiveness of the heuristic. 3.Under different maintenance circumstances, we develop six algorithms to improve the EDD method used by the studied company. The problem under consideration is to find a schedule that minimizes the number of tardiness jobs subject to one maintenance. The improvement ratios of the six algorithms are shown in this thesis. Computational results are provided to demonstrate the effectiveness of the algorithms.
author2 廖慶榮
author_facet 廖慶榮
Chen Wen-Jinn
陳文進
author Chen Wen-Jinn
陳文進
spellingShingle Chen Wen-Jinn
陳文進
Single Machine Scheduling with Breakdown and Maintenance
author_sort Chen Wen-Jinn
title Single Machine Scheduling with Breakdown and Maintenance
title_short Single Machine Scheduling with Breakdown and Maintenance
title_full Single Machine Scheduling with Breakdown and Maintenance
title_fullStr Single Machine Scheduling with Breakdown and Maintenance
title_full_unstemmed Single Machine Scheduling with Breakdown and Maintenance
title_sort single machine scheduling with breakdown and maintenance
publishDate 2002
url http://ndltd.ncl.edu.tw/handle/18018658154953019328
work_keys_str_mv AT chenwenjinn singlemachineschedulingwithbreakdownandmaintenance
AT chénwénjìn singlemachineschedulingwithbreakdownandmaintenance
AT chenwenjinn dānjīgùzhàngyǔwéixiūzhīpáichéngyánjiū
AT chénwénjìn dānjīgùzhàngyǔwéixiūzhīpáichéngyánjiū
_version_ 1717756189730668544