The Study of Supply and Demand about Industrial Use Water in Tao-Chiu Region

碩士 === 中原大學 === 土木工程研究所 === 91 === The Study of Supply and Demand about Industrial Use Water in Tao-Chiu Region Student: Shih, Hsien-Hsun Advisor: Lee, Chin-Dee The Department of Civil Engineering Chung-Yuan Christian University Abstract The safety and...

Full description

Bibliographic Details
Main Authors: Hsien-Hsun Shih, 石憲勳
Other Authors: Chin-Dee Lee
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/te232s
Description
Summary:碩士 === 中原大學 === 土木工程研究所 === 91 === The Study of Supply and Demand about Industrial Use Water in Tao-Chiu Region Student: Shih, Hsien-Hsun Advisor: Lee, Chin-Dee The Department of Civil Engineering Chung-Yuan Christian University Abstract The safety and stability of the industrial water distribution is highly monitored, as the risk for lack of water is unbearable. The industrial manufacturing equipment must be in operation continuously, in order to deal with shortage of water supply in the long run. Thus, the conditions on industrial water distribution at the present or future state in these districts have to be monitored at all times, in order to maintain secured and stabled water supply. The research shows that the maximum daily water supply in Tao-Yuan district is around 104.26 thousand CMD, Hsin-Chu district is around 39.75 thousand CMD, an approximate of total of 144.01 thousand CMD of water is supplied daily. In the year 2021, the maximum daily water supply in Tao-Yuan district will be around 157.15 thousand CMD and Hsin-Chu district will be around 65.82 thousand CMD, with an approximate of total of 222.97 thousand CMD of water will be supplied daily. Presently, the Water Purification Work in these two districts is around 122.3 thousand CMD in Tao-Yuan and 39 thousand CMD in Hsin-Chu, a total of 161.3 thousand CMD of water is supplied, present water supplied is greater than the maximum daily water supplied of 144.01 thousand CMD, this unbalancing distribution is still manageable. In the future, these two districts will have to deal with water supply of 223 thousand CMD daily, besides the present water purification equipments, it would still need supports from Bao-Shan and the expansion of Bao-Shan Water Purification Work, in order to satisfy the needs in the year 2021.