Design,Investigation and Assessment of the Pumping System of Buildings
碩士 === 逢甲大學 === 土木及水利工程所 === 91 === The improper choice of pumps for the pumping system of buildings will cause problems such as power waste, water supply insufficiency, or pumping system function not meeting the proper need of original design and pump replacement, etc. Besides the summaries and th...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/48171434160402547980 |
id |
ndltd-TW-091FCU05017002 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-091FCU050170022015-10-13T17:01:19Z http://ndltd.ncl.edu.tw/handle/48171434160402547980 Design,Investigation and Assessment of the Pumping System of Buildings 建築物抽水系統之設計、調查與評估 An-Gwo Chen 陳安國 碩士 逢甲大學 土木及水利工程所 91 The improper choice of pumps for the pumping system of buildings will cause problems such as power waste, water supply insufficiency, or pumping system function not meeting the proper need of original design and pump replacement, etc. Besides the summaries and theories of the pumping systems, the methods of choosing pumps in theoretical studies and in pumping business are included in this essay. Three examples will be discussed and compared by using theoretical method and the method in practical business. In practical business, they do not draw the comparison between system head curves and pump performance curves; They often choose pump suppliers only by experience and business relationship; They decide pump suppliers in advance, and then buy pumps from pump catalogue given by the suppliers. Therefore, the chosen pumps will be different from those in theory. When choosing pumps, we suggest that (1) find a couple of suppliers and apply the theoretical methods to calculate the head loss and the actual head rise, and (2) compare with the system curves and pump performance curves given by the suppliers. In this way, an appropriate pump can be chosen to comply with the design need. Finally, a better and faster way to calculate the actual head rise will be suggested in this essay. none 鄭仙偉 2003 學位論文 ; thesis 73 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 逢甲大學 === 土木及水利工程所 === 91 === The improper choice of pumps for the pumping system of buildings will cause problems such as power waste, water supply insufficiency, or pumping system function not meeting the proper need of original design and pump replacement, etc. Besides the summaries and theories of the pumping systems, the methods of choosing pumps in theoretical studies and in pumping business are included in this essay. Three examples will be discussed and compared by using theoretical method and the method in practical business. In practical business, they do not draw the comparison between system head curves and pump performance curves; They often choose pump suppliers only by experience and business relationship; They decide pump suppliers in advance, and then buy pumps from pump catalogue given by the suppliers. Therefore, the chosen pumps will be different from those in theory. When choosing pumps, we suggest that (1) find a couple of suppliers and apply the theoretical methods to calculate the head loss and the actual head rise, and (2) compare with the system curves and pump performance curves given by the suppliers. In this way, an appropriate pump can be chosen to comply with the design need. Finally, a better and faster way to calculate the actual head rise will be suggested in this essay.
|
author2 |
none |
author_facet |
none An-Gwo Chen 陳安國 |
author |
An-Gwo Chen 陳安國 |
spellingShingle |
An-Gwo Chen 陳安國 Design,Investigation and Assessment of the Pumping System of Buildings |
author_sort |
An-Gwo Chen |
title |
Design,Investigation and Assessment of the Pumping System of Buildings |
title_short |
Design,Investigation and Assessment of the Pumping System of Buildings |
title_full |
Design,Investigation and Assessment of the Pumping System of Buildings |
title_fullStr |
Design,Investigation and Assessment of the Pumping System of Buildings |
title_full_unstemmed |
Design,Investigation and Assessment of the Pumping System of Buildings |
title_sort |
design,investigation and assessment of the pumping system of buildings |
publishDate |
2003 |
url |
http://ndltd.ncl.edu.tw/handle/48171434160402547980 |
work_keys_str_mv |
AT angwochen designinvestigationandassessmentofthepumpingsystemofbuildings AT chénānguó designinvestigationandassessmentofthepumpingsystemofbuildings AT angwochen jiànzhúwùchōushuǐxìtǒngzhīshèjìdiàocháyǔpínggū AT chénānguó jiànzhúwùchōushuǐxìtǒngzhīshèjìdiàocháyǔpínggū |
_version_ |
1717777862984990720 |