Research on the Construction Methods of Bridge and Failure Mechanism
碩士 === 國立中興大學 === 土木工程學系 === 91 === In 1990’s, when the north part of the Second Highway in Taiwan was constructing, some new construction methods were applied to make the construction of bridges faster and the costs lower; such as Cantilever Construction, Advanced Shoring Bridge Construction, Incre...
Main Authors: | Jenyang Sheu, 許振揚 |
---|---|
Other Authors: | 黃玉麟 |
Format: | Others |
Language: | zh-TW |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/58617958539928961736 |
Similar Items
-
Research on Construction Problems and Whole-bridge Failure Modes for Bridge with Extradosed Method
by: Kuang-Chih Hsieh, et al.
Published: (2012) -
The Research of Bridge Failure Case by Using Unbalanced Cantilever Construction Method
by: Wu Hou Yu, et al.
Published: (2009) -
On Bridging Taiwan's Marriage Immigrant Policy and International Human Rights Norms
by: Sheng-JenYang, et al.
Published: (2012) -
Practice and research of advanced shoring bridge construction method
by: 王志宏
Published: (2005) -
The Research for the Failure Model of Bridge Structure
by: 吳東昇
Published: (1999)