Establishing of Performance Tool for Public Work Construction
碩士 === 國立成功大學 === 土木工程學系碩博士班 === 91 === Measures are used to evaluate performance or the achievement of a construction project. The performance of public work construction is often evaluated by few indicators, such as budget consumption percentage, or separated evaluation on quality. However, this i...
Main Authors: | Xin-Cheng Guo, 郭信成 |
---|---|
Other Authors: | A. S. Chang |
Format: | Others |
Language: | zh-TW |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/96781971655970841816 |
Similar Items
-
Establishing Feedback Systems for Public Work Construction
by: Chung-Yi Chen, et al.
Published: (2003) -
Establish of Disaster Prevention Microgrid
by: LIN, HSIN-CHENG, et al.
Published: (2018) -
Sustainable Public Procurement : Development and analysis of tools for construction works
by: Verzat, Benoit
Published: (2008) -
Establishing Performance Evaluation Mechanisms during Construction Phase for Public Constructions-An Example on Building Construction Projects
by: Pei-Chun Chen, et al.
Published: (2011) -
Establishing a Performance Evaluation Model of Government Agency for the Public Works
by: Shiu-Je Li, et al.
Published: (2005)