Integrated solution for multi-stage wafer probing scheduling problem with reentry

碩士 === 國立交通大學 === 工業工程與管理系 === 91 === The multi-stage wafer probing scheduling problem (M-WPSP) with reentry, is a practical variation of the parallel-machine scheduling problem. Since the M-WPSP involves multiple product families with various job due dates, ready times, reentry, serial and batch op...

Full description

Bibliographic Details
Main Authors: Kuan-Peng Hsiao, 蕭冠鵬
Other Authors: Wen-Lea Pearn
Format: Others
Language:en_US
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/00392554818343846988
id ndltd-TW-091NCTU0031039
record_format oai_dc
spelling ndltd-TW-091NCTU00310392016-06-22T04:14:05Z http://ndltd.ncl.edu.tw/handle/00392554818343846988 Integrated solution for multi-stage wafer probing scheduling problem with reentry 多階段再回流晶圓針測排程問題之整合性解法 Kuan-Peng Hsiao 蕭冠鵬 碩士 國立交通大學 工業工程與管理系 91 The multi-stage wafer probing scheduling problem (M-WPSP) with reentry, is a practical variation of the parallel-machine scheduling problem. Since the M-WPSP involves multiple product families with various job due dates, ready times, reentry, serial and batch operations, sequential dependent setup time, it is more difficult to solve than the classical parallel machine scheduling problems. In this thesis, we consider two strategies to solve the M-WPSP, where the total machine workload must be minimized. The sequential strategy schedules the jobs at the required stages according to the sequence of manufacturing operations. The parallel strategy is designed specifically for the reentrant characteristic. In additional to this, we investigate five existing insertion procedures and develop three modified insertion procedures, which are used to implement the proposed strategies and solve the M-WPSP. To evaluate the efficiency of the proposed strategies, a set of test problems involving four critical factors: the product family ratio, the temperature-change consideration, tightness of due dates, and ready time are designed to test the quality of solutions under two different workload environments. To test the performance of five existing insertion procedures and three modified insertion procedures, another set of test problems, which also involve the critical factors, are provided and analyzed under a single stage environment. Wen-Lea Pearn Shu-Hsing Chung 彭文理 鍾淑馨 2003 學位論文 ; thesis 43 en_US
collection NDLTD
language en_US
format Others
sources NDLTD
description 碩士 === 國立交通大學 === 工業工程與管理系 === 91 === The multi-stage wafer probing scheduling problem (M-WPSP) with reentry, is a practical variation of the parallel-machine scheduling problem. Since the M-WPSP involves multiple product families with various job due dates, ready times, reentry, serial and batch operations, sequential dependent setup time, it is more difficult to solve than the classical parallel machine scheduling problems. In this thesis, we consider two strategies to solve the M-WPSP, where the total machine workload must be minimized. The sequential strategy schedules the jobs at the required stages according to the sequence of manufacturing operations. The parallel strategy is designed specifically for the reentrant characteristic. In additional to this, we investigate five existing insertion procedures and develop three modified insertion procedures, which are used to implement the proposed strategies and solve the M-WPSP. To evaluate the efficiency of the proposed strategies, a set of test problems involving four critical factors: the product family ratio, the temperature-change consideration, tightness of due dates, and ready time are designed to test the quality of solutions under two different workload environments. To test the performance of five existing insertion procedures and three modified insertion procedures, another set of test problems, which also involve the critical factors, are provided and analyzed under a single stage environment.
author2 Wen-Lea Pearn
author_facet Wen-Lea Pearn
Kuan-Peng Hsiao
蕭冠鵬
author Kuan-Peng Hsiao
蕭冠鵬
spellingShingle Kuan-Peng Hsiao
蕭冠鵬
Integrated solution for multi-stage wafer probing scheduling problem with reentry
author_sort Kuan-Peng Hsiao
title Integrated solution for multi-stage wafer probing scheduling problem with reentry
title_short Integrated solution for multi-stage wafer probing scheduling problem with reentry
title_full Integrated solution for multi-stage wafer probing scheduling problem with reentry
title_fullStr Integrated solution for multi-stage wafer probing scheduling problem with reentry
title_full_unstemmed Integrated solution for multi-stage wafer probing scheduling problem with reentry
title_sort integrated solution for multi-stage wafer probing scheduling problem with reentry
publishDate 2003
url http://ndltd.ncl.edu.tw/handle/00392554818343846988
work_keys_str_mv AT kuanpenghsiao integratedsolutionformultistagewaferprobingschedulingproblemwithreentry
AT xiāoguānpéng integratedsolutionformultistagewaferprobingschedulingproblemwithreentry
AT kuanpenghsiao duōjiēduànzàihuíliújīngyuánzhēncèpáichéngwèntízhīzhěnghéxìngjiěfǎ
AT xiāoguānpéng duōjiēduànzàihuíliújīngyuánzhēncèpáichéngwèntízhīzhěnghéxìngjiěfǎ
_version_ 1718314825513172992