A Study on Priority Ranking of Highway Construction Plans in I-Lan County

碩士 === 國立交通大學 === 交通運輸研究所 === 91 === The process of ranking the priority of constructing the highway, including Provincial highway and County highway is conducted as follows. First, DGH (Directorate General of Highway) is following the principle of “Highway Construction Planning in Taiwan” to make...

Full description

Bibliographic Details
Main Authors: Hsin-Yu Li, 李信佑
Other Authors: Cherng-Chwan Hwang
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/69081711525352418632
id ndltd-TW-091NCTU0118034
record_format oai_dc
spelling ndltd-TW-091NCTU01180342016-06-22T04:14:05Z http://ndltd.ncl.edu.tw/handle/69081711525352418632 A Study on Priority Ranking of Highway Construction Plans in I-Lan County 宜蘭縣公路建設計畫優先順序之研究 Hsin-Yu Li 李信佑 碩士 國立交通大學 交通運輸研究所 91 The process of ranking the priority of constructing the highway, including Provincial highway and County highway is conducted as follows. First, DGH (Directorate General of Highway) is following the principle of “Highway Construction Planning in Taiwan” to make relative plans that should match up the national policy. Second, those plans are verified by MOTC (Ministry Of Transportation and Communications) and are appraised and decided by EY (Executive Yuan). Third, DGH checks the annual budget of all plans and sets up its priority then transfer those plans to MOTC and EY to evaluate and get the permission. Finally, those plans is executed after the budget is approved by LY(Legislate Yuan) . Over process, no matter in making or appraising plans by any layer of government, no systematic assess method is applied, although the decision usually made through several times of meeting and discussion. For the best utilization of country resources, this study begins with reviewing the method of AHP、SAW、ELECTRE、TOPSIS、MCDM、Delphi and Cluster analysis etc., as well as relative cases of internal and overseas. And then analyze the present situation and future develop characters regarding property、economic、environment and traffic in I-Lan County, according to “Integrate Development Plan in I-Lan County ”. Then set up the structure of goal、object and criteria to assess the priority ranking of highway construction on Provincial highway and County highway in I-Lan County from the year 2004 to 2008. AHP and Delphi method is used in this study to weight criteria, and SAW is applied to calculate the total score of each construction case, and to determine the rank of priority. Finally, the author uses CA(cluster analysis) to cluster all cases and list annual budget in I-Lan County from the year 2004 to 2008, for the purpose to serve as a reference for government in making decisions. Cherng-Chwan Hwang 黃承傳 2003 學位論文 ; thesis 94 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立交通大學 === 交通運輸研究所 === 91 === The process of ranking the priority of constructing the highway, including Provincial highway and County highway is conducted as follows. First, DGH (Directorate General of Highway) is following the principle of “Highway Construction Planning in Taiwan” to make relative plans that should match up the national policy. Second, those plans are verified by MOTC (Ministry Of Transportation and Communications) and are appraised and decided by EY (Executive Yuan). Third, DGH checks the annual budget of all plans and sets up its priority then transfer those plans to MOTC and EY to evaluate and get the permission. Finally, those plans is executed after the budget is approved by LY(Legislate Yuan) . Over process, no matter in making or appraising plans by any layer of government, no systematic assess method is applied, although the decision usually made through several times of meeting and discussion. For the best utilization of country resources, this study begins with reviewing the method of AHP、SAW、ELECTRE、TOPSIS、MCDM、Delphi and Cluster analysis etc., as well as relative cases of internal and overseas. And then analyze the present situation and future develop characters regarding property、economic、environment and traffic in I-Lan County, according to “Integrate Development Plan in I-Lan County ”. Then set up the structure of goal、object and criteria to assess the priority ranking of highway construction on Provincial highway and County highway in I-Lan County from the year 2004 to 2008. AHP and Delphi method is used in this study to weight criteria, and SAW is applied to calculate the total score of each construction case, and to determine the rank of priority. Finally, the author uses CA(cluster analysis) to cluster all cases and list annual budget in I-Lan County from the year 2004 to 2008, for the purpose to serve as a reference for government in making decisions.
author2 Cherng-Chwan Hwang
author_facet Cherng-Chwan Hwang
Hsin-Yu Li
李信佑
author Hsin-Yu Li
李信佑
spellingShingle Hsin-Yu Li
李信佑
A Study on Priority Ranking of Highway Construction Plans in I-Lan County
author_sort Hsin-Yu Li
title A Study on Priority Ranking of Highway Construction Plans in I-Lan County
title_short A Study on Priority Ranking of Highway Construction Plans in I-Lan County
title_full A Study on Priority Ranking of Highway Construction Plans in I-Lan County
title_fullStr A Study on Priority Ranking of Highway Construction Plans in I-Lan County
title_full_unstemmed A Study on Priority Ranking of Highway Construction Plans in I-Lan County
title_sort study on priority ranking of highway construction plans in i-lan county
publishDate 2003
url http://ndltd.ncl.edu.tw/handle/69081711525352418632
work_keys_str_mv AT hsinyuli astudyonpriorityrankingofhighwayconstructionplansinilancounty
AT lǐxìnyòu astudyonpriorityrankingofhighwayconstructionplansinilancounty
AT hsinyuli yílánxiàngōnglùjiànshèjìhuàyōuxiānshùnxùzhīyánjiū
AT lǐxìnyòu yílánxiàngōnglùjiànshèjìhuàyōuxiānshùnxùzhīyánjiū
AT hsinyuli studyonpriorityrankingofhighwayconstructionplansinilancounty
AT lǐxìnyòu studyonpriorityrankingofhighwayconstructionplansinilancounty
_version_ 1718314870258008064