A Study on The Method of Ground Water Recharge in Ping-Tung Plain

碩士 === 國立屏東科技大學 === 土木工程系碩士班 === 91 === The groundwater recharge schemes accomplished in Pingtung Plain are Chi-Yang artificial lake, Chang-Lung ASR plan, Linbien River upstream artificial lake, and a series of River-Hydraulic-Weir for water source conservation. This study focuses on the benefit ana...

Full description

Bibliographic Details
Main Authors: HSIEH SHENG HSIN, 謝勝信
Other Authors: 王裕民
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/40602065342385693152
id ndltd-TW-091NPUST015034
record_format oai_dc
spelling ndltd-TW-091NPUST0150342016-12-22T04:12:24Z http://ndltd.ncl.edu.tw/handle/40602065342385693152 A Study on The Method of Ground Water Recharge in Ping-Tung Plain 屏東平原地下水補注方案之探討 HSIEH SHENG HSIN 謝勝信 碩士 國立屏東科技大學 土木工程系碩士班 91 The groundwater recharge schemes accomplished in Pingtung Plain are Chi-Yang artificial lake, Chang-Lung ASR plan, Linbien River upstream artificial lake, and a series of River-Hydraulic-Weir for water source conservation. This study focuses on the benefit analysis between above schemes and present the construction of sub-weir across the riverbed at up stream. From the analysis of the study, the effect of groundwater recharge by the construction of sub-weir at alluvial fan of Pingtung Plain is recommended. It is estimated that the invest 4,447 million $NT can result 407 million m3 of groundwater recharge per year, and the averge investment benefit is 0.0915 m3 of water per NT dollar. Besides, the investment cost of sub-weir construction across Ailiao Riverbed is 708 million $NT, it can obtain 85 million m3 of groundwater recharge per year and produce 0.12 m3 of water per NT dollar of investment benefit, 0.1 m3 of water per NT dollar for Laolung River, 0.06 m3 of water per NT dollar for Lili River, 0.05 m3 of water per NT dollar for Linpien River respectively. Due to groundwater abstraction in Pingtung Plain increases dramatically, and public resistance also obstructs large-scale water resource exploitation schemes, the construction of sub-weir at upstream riverbed for groundwater recharge is an alternative scheme. 王裕民 2003 學位論文 ; thesis 89 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立屏東科技大學 === 土木工程系碩士班 === 91 === The groundwater recharge schemes accomplished in Pingtung Plain are Chi-Yang artificial lake, Chang-Lung ASR plan, Linbien River upstream artificial lake, and a series of River-Hydraulic-Weir for water source conservation. This study focuses on the benefit analysis between above schemes and present the construction of sub-weir across the riverbed at up stream. From the analysis of the study, the effect of groundwater recharge by the construction of sub-weir at alluvial fan of Pingtung Plain is recommended. It is estimated that the invest 4,447 million $NT can result 407 million m3 of groundwater recharge per year, and the averge investment benefit is 0.0915 m3 of water per NT dollar. Besides, the investment cost of sub-weir construction across Ailiao Riverbed is 708 million $NT, it can obtain 85 million m3 of groundwater recharge per year and produce 0.12 m3 of water per NT dollar of investment benefit, 0.1 m3 of water per NT dollar for Laolung River, 0.06 m3 of water per NT dollar for Lili River, 0.05 m3 of water per NT dollar for Linpien River respectively. Due to groundwater abstraction in Pingtung Plain increases dramatically, and public resistance also obstructs large-scale water resource exploitation schemes, the construction of sub-weir at upstream riverbed for groundwater recharge is an alternative scheme.
author2 王裕民
author_facet 王裕民
HSIEH SHENG HSIN
謝勝信
author HSIEH SHENG HSIN
謝勝信
spellingShingle HSIEH SHENG HSIN
謝勝信
A Study on The Method of Ground Water Recharge in Ping-Tung Plain
author_sort HSIEH SHENG HSIN
title A Study on The Method of Ground Water Recharge in Ping-Tung Plain
title_short A Study on The Method of Ground Water Recharge in Ping-Tung Plain
title_full A Study on The Method of Ground Water Recharge in Ping-Tung Plain
title_fullStr A Study on The Method of Ground Water Recharge in Ping-Tung Plain
title_full_unstemmed A Study on The Method of Ground Water Recharge in Ping-Tung Plain
title_sort study on the method of ground water recharge in ping-tung plain
publishDate 2003
url http://ndltd.ncl.edu.tw/handle/40602065342385693152
work_keys_str_mv AT hsiehshenghsin astudyonthemethodofgroundwaterrechargeinpingtungplain
AT xièshèngxìn astudyonthemethodofgroundwaterrechargeinpingtungplain
AT hsiehshenghsin píngdōngpíngyuándexiàshuǐbǔzhùfāngànzhītàntǎo
AT xièshèngxìn píngdōngpíngyuándexiàshuǐbǔzhùfāngànzhītàntǎo
AT hsiehshenghsin studyonthemethodofgroundwaterrechargeinpingtungplain
AT xièshèngxìn studyonthemethodofgroundwaterrechargeinpingtungplain
_version_ 1718402887375126528