Adaptive Lot/Equipment Matching Strategy and GA Based Approach for Optimized Dispatching and Scheduling in a Wafer Probe Center

碩士 === 國立臺灣大學 === 資訊工程學研究所 === 91 === In this thesis, we propose an Adaptive Lot/Equipment Matching Strategy to optimize dispatching in a wafer probe center. In this mechanism, we use a graphical and mathematical modeling tool — Colored-Timed Petri Nets (CTPN) to model the testing flow in the wafer...

Full description

Bibliographic Details
Main Authors: Shen, Yi-Shiuan, 沈怡瑄
Other Authors: Fu, Li-Chen
Format: Others
Language:en_US
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/58576188335353360121
id ndltd-TW-091NTU00392087
record_format oai_dc
spelling ndltd-TW-091NTU003920872016-06-20T04:15:44Z http://ndltd.ncl.edu.tw/handle/58576188335353360121 Adaptive Lot/Equipment Matching Strategy and GA Based Approach for Optimized Dispatching and Scheduling in a Wafer Probe Center 以適應性批貨/設備配對策略與遺傳演算法於晶圓測試廠最佳化之派工與排程 Shen, Yi-Shiuan 沈怡瑄 碩士 國立臺灣大學 資訊工程學研究所 91 In this thesis, we propose an Adaptive Lot/Equipment Matching Strategy to optimize dispatching in a wafer probe center. In this mechanism, we use a graphical and mathematical modeling tool — Colored-Timed Petri Nets (CTPN) to model the testing flow in the wafer probe center. Moreover, we apply the genetic algorithm to help this mechanism to obtain a near-optimal solution. The main model in this thesis includes not only the detailed machine behaviors but also the equipment capabilities and the routing of lots. With this CTPN model, we can simulate the production processes, and keep track of the equipment status and the lot conditions efficiently and precisely. In addition, different scheduling policies can be evaluated via simulations, and a superior policy will then be determined. In the dispatching phase, we first present the lot based selection scheme and the equipment based selection scheme. Each of these two schemes has its own advantages, but it also has some drawbacks. Therefore, we propose a new method — Pair Generation Mechanism, which will keep both advantages but will be free of either disadvantages. In other words, we can promise a dispatching strategy that can be more optimal in the sense that both the lot-based and equipment-based viewpoints will be taken into account when lot/equipment matching needs to be done. In this thesis, we further adopt another efficient algorithm — Auction Algorithm to help us to find out the optimal solution to the lot/equipment matching problem. Besides, some adaptive factors will also be applied in this phase. At last in the scheduling phase, we apply the genetic algorithm (GA) based approach to obtain a near-optimal solution to our scheduling problem. From our experiment results, the developed CTPN based Genetic Algorithm will yield a more efficient solution than several other schedulers, so that this GA scheduler can indeed satisfy the needs for a rapidly changing environment, such as the wafer probe center. Fu, Li-Chen 傅立成 2003 學位論文 ; thesis 80 en_US
collection NDLTD
language en_US
format Others
sources NDLTD
description 碩士 === 國立臺灣大學 === 資訊工程學研究所 === 91 === In this thesis, we propose an Adaptive Lot/Equipment Matching Strategy to optimize dispatching in a wafer probe center. In this mechanism, we use a graphical and mathematical modeling tool — Colored-Timed Petri Nets (CTPN) to model the testing flow in the wafer probe center. Moreover, we apply the genetic algorithm to help this mechanism to obtain a near-optimal solution. The main model in this thesis includes not only the detailed machine behaviors but also the equipment capabilities and the routing of lots. With this CTPN model, we can simulate the production processes, and keep track of the equipment status and the lot conditions efficiently and precisely. In addition, different scheduling policies can be evaluated via simulations, and a superior policy will then be determined. In the dispatching phase, we first present the lot based selection scheme and the equipment based selection scheme. Each of these two schemes has its own advantages, but it also has some drawbacks. Therefore, we propose a new method — Pair Generation Mechanism, which will keep both advantages but will be free of either disadvantages. In other words, we can promise a dispatching strategy that can be more optimal in the sense that both the lot-based and equipment-based viewpoints will be taken into account when lot/equipment matching needs to be done. In this thesis, we further adopt another efficient algorithm — Auction Algorithm to help us to find out the optimal solution to the lot/equipment matching problem. Besides, some adaptive factors will also be applied in this phase. At last in the scheduling phase, we apply the genetic algorithm (GA) based approach to obtain a near-optimal solution to our scheduling problem. From our experiment results, the developed CTPN based Genetic Algorithm will yield a more efficient solution than several other schedulers, so that this GA scheduler can indeed satisfy the needs for a rapidly changing environment, such as the wafer probe center.
author2 Fu, Li-Chen
author_facet Fu, Li-Chen
Shen, Yi-Shiuan
沈怡瑄
author Shen, Yi-Shiuan
沈怡瑄
spellingShingle Shen, Yi-Shiuan
沈怡瑄
Adaptive Lot/Equipment Matching Strategy and GA Based Approach for Optimized Dispatching and Scheduling in a Wafer Probe Center
author_sort Shen, Yi-Shiuan
title Adaptive Lot/Equipment Matching Strategy and GA Based Approach for Optimized Dispatching and Scheduling in a Wafer Probe Center
title_short Adaptive Lot/Equipment Matching Strategy and GA Based Approach for Optimized Dispatching and Scheduling in a Wafer Probe Center
title_full Adaptive Lot/Equipment Matching Strategy and GA Based Approach for Optimized Dispatching and Scheduling in a Wafer Probe Center
title_fullStr Adaptive Lot/Equipment Matching Strategy and GA Based Approach for Optimized Dispatching and Scheduling in a Wafer Probe Center
title_full_unstemmed Adaptive Lot/Equipment Matching Strategy and GA Based Approach for Optimized Dispatching and Scheduling in a Wafer Probe Center
title_sort adaptive lot/equipment matching strategy and ga based approach for optimized dispatching and scheduling in a wafer probe center
publishDate 2003
url http://ndltd.ncl.edu.tw/handle/58576188335353360121
work_keys_str_mv AT shenyishiuan adaptivelotequipmentmatchingstrategyandgabasedapproachforoptimizeddispatchingandschedulinginawaferprobecenter
AT chényíxuān adaptivelotequipmentmatchingstrategyandgabasedapproachforoptimizeddispatchingandschedulinginawaferprobecenter
AT shenyishiuan yǐshìyīngxìngpīhuòshèbèipèiduìcèlüèyǔyíchuányǎnsuànfǎyújīngyuáncèshìchǎngzuìjiāhuàzhīpàigōngyǔpáichéng
AT chényíxuān yǐshìyīngxìngpīhuòshèbèipèiduìcèlüèyǔyíchuányǎnsuànfǎyújīngyuáncèshìchǎngzuìjiāhuàzhīpàigōngyǔpáichéng
_version_ 1718310320444801024