The Multiple-Objective Scheduling in Flow Shop Scheduling with Sequence Dependent Setup Times
碩士 === 國立雲林科技大學 === 工業工程與管理研究所碩士班 === 91 === Due to the changing market and the short life span of the products, the production system becomes to complex problem. It is the important that the business needs to catch up with market trend to get more profit and responds to customer needs quickly by a...
Main Authors: | Shihkai Lin, 林士凱 |
---|---|
Other Authors: | none |
Format: | Others |
Language: | zh-TW |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/23029911661643003808 |
Similar Items
-
Job Shop Scheduling With Swquence Dependent Setup Times
by: Kun Hung Lin, et al.
Published: (2003) -
Dual Flow Shops Scheduling with Family Setup Times
by: Lin, Cih-Ying, et al.
Published: (2009) -
Hybrid Flow Shop Scheduling with Unrelated Parallel Machines and Sequence-dependent Setup Time
by: Shao-Hao Chang, et al.
Published: (2018) -
Bi-criteria group scheduling with sequence-dependent setup time in a flow shop
by: Lu, Dongchen
Published: (2012) -
Scheduling Blocking Flowshops with Sequence-dependent Setup Times
by: HUANG, SHI-YAO, et al.
Published: (2019)