Constructing the Mechanism of Earned Value Performance Analysis for Multi-Projects

碩士 === 逢甲大學 === 工業工程學所 === 92 === More and more enterprises diversify their products to meet the requests from different customers. While the product is changed to multi-customerization, it makes their products more complicated, and at the same time, it increases the difficulty of cost estimation a...

Full description

Bibliographic Details
Main Authors: Ko-Min Mao, 毛格民
Other Authors: Yau-ren Shiau
Format: Others
Language:zh-TW
Published: 2004
Online Access:http://ndltd.ncl.edu.tw/handle/90070614296642599493
id ndltd-TW-092FCU05030055
record_format oai_dc
spelling ndltd-TW-092FCU050300552015-10-13T13:01:03Z http://ndltd.ncl.edu.tw/handle/90070614296642599493 Constructing the Mechanism of Earned Value Performance Analysis for Multi-Projects 多專案實獲值績效分析機制之建立 Ko-Min Mao 毛格民 碩士 逢甲大學 工業工程學所 92 More and more enterprises diversify their products to meet the requests from different customers. While the product is changed to multi-customerization, it makes their products more complicated, and at the same time, it increases the difficulty of cost estimation and performance analysis. Therefore, we need to develop a related operation mechanism to professionalize the management and to construct a quick response mechanism to increase the competitive ability of the enterprises. This research utilized multi-projects to illustrate the module of product customerization, plus to view each single product as a unique project management. In addition to adopt matrix organization structure, which meets the requirements of multi-projects, to correct the defects of a functional organization structure, it also develop the spirit of earned value (EV) to separate different activities to work breakdown structure packages (WBS package), through the work breakdown structure(WBS). The contents include work description, the requirements of material, labor, and cost. As it contents the estimation of each product, it helps the analysis of cost performance. Besides, to apply its feedback system to collect all cost data of products to update the baseline of each WBS, it provides not only the reference data of the product cost management of a project, it also gives the reference of schedule planning, milestone/check point setting up, work distributing, resources allocating, cost collecting and cost control for a project to construct an systemized management mechanism. This research also adopts the method of Pareto Analysis to discover the critical WBS item and the items that will affect the cost performance. Following the analysis, we can control, improve, and reallocate the resources, in addition, can recover and ensure the conducting performance of the project. Based on EV, this research constructs the mechanism of multi-projects cost performance analysis. It can provide more integrative and efficient management for the enterprises in each life cycle phase from the organization, work distribution, project control to the end of the project. Yau-ren Shiau 蕭堯仁 2004 學位論文 ; thesis 113 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 逢甲大學 === 工業工程學所 === 92 === More and more enterprises diversify their products to meet the requests from different customers. While the product is changed to multi-customerization, it makes their products more complicated, and at the same time, it increases the difficulty of cost estimation and performance analysis. Therefore, we need to develop a related operation mechanism to professionalize the management and to construct a quick response mechanism to increase the competitive ability of the enterprises. This research utilized multi-projects to illustrate the module of product customerization, plus to view each single product as a unique project management. In addition to adopt matrix organization structure, which meets the requirements of multi-projects, to correct the defects of a functional organization structure, it also develop the spirit of earned value (EV) to separate different activities to work breakdown structure packages (WBS package), through the work breakdown structure(WBS). The contents include work description, the requirements of material, labor, and cost. As it contents the estimation of each product, it helps the analysis of cost performance. Besides, to apply its feedback system to collect all cost data of products to update the baseline of each WBS, it provides not only the reference data of the product cost management of a project, it also gives the reference of schedule planning, milestone/check point setting up, work distributing, resources allocating, cost collecting and cost control for a project to construct an systemized management mechanism. This research also adopts the method of Pareto Analysis to discover the critical WBS item and the items that will affect the cost performance. Following the analysis, we can control, improve, and reallocate the resources, in addition, can recover and ensure the conducting performance of the project. Based on EV, this research constructs the mechanism of multi-projects cost performance analysis. It can provide more integrative and efficient management for the enterprises in each life cycle phase from the organization, work distribution, project control to the end of the project.
author2 Yau-ren Shiau
author_facet Yau-ren Shiau
Ko-Min Mao
毛格民
author Ko-Min Mao
毛格民
spellingShingle Ko-Min Mao
毛格民
Constructing the Mechanism of Earned Value Performance Analysis for Multi-Projects
author_sort Ko-Min Mao
title Constructing the Mechanism of Earned Value Performance Analysis for Multi-Projects
title_short Constructing the Mechanism of Earned Value Performance Analysis for Multi-Projects
title_full Constructing the Mechanism of Earned Value Performance Analysis for Multi-Projects
title_fullStr Constructing the Mechanism of Earned Value Performance Analysis for Multi-Projects
title_full_unstemmed Constructing the Mechanism of Earned Value Performance Analysis for Multi-Projects
title_sort constructing the mechanism of earned value performance analysis for multi-projects
publishDate 2004
url http://ndltd.ncl.edu.tw/handle/90070614296642599493
work_keys_str_mv AT kominmao constructingthemechanismofearnedvalueperformanceanalysisformultiprojects
AT máogémín constructingthemechanismofearnedvalueperformanceanalysisformultiprojects
AT kominmao duōzhuānànshíhuòzhíjīxiàofēnxījīzhìzhījiànlì
AT máogémín duōzhuānànshíhuòzhíjīxiàofēnxījīzhìzhījiànlì
_version_ 1716870074535510016