Minimizing the maximum tardiness in a two-machine flowshop problem with learning considerations
碩士 === 逢甲大學 === 統計與精算所 === 92 === This paper studies a two-machine flowshop scheduling problem with a learning effect where its objective is to find a sequence to minimize the maximum tardiness. We apply a branch-and-bound method and a simulated annealing (SA) method to search for an optimal solutio...
Main Authors: | Wei-Chieh Wang, 王韋傑 |
---|---|
Other Authors: | Chin-Chia Wu |
Format: | Others |
Language: | zh-TW |
Published: |
2004
|
Online Access: | http://ndltd.ncl.edu.tw/handle/29379445813137758151 |
Similar Items
-
Minimizing total tardiness for two-machine flowshop schedualing
by: Fan, En-Zu, et al.
Published: (1994) -
Two-machine flowshop scheduling to minimize the number of tardy jobs
by: Wan-Ling Shie, et al.
Published: (2004) -
Minimizing total tardiness of two processes re-entrant flowshop problem
by: Man-Hsuan Chen, et al.
Published: (2013) -
Two-Machine No-wait Total Tardiness Flowshop Scheduling Problem
by: Sheng-Fa Yang, et al.
Published: (2006) -
Minimizing the total tardiness on a two-machine flowshop scheduling problem with a precedence constraint
by: 温志皓
Published: (2014)