none

博士 === 國立成功大學 === 工業管理科學系碩博士班 === 92 === This research provides manufacturers with the effects of different suppliers’ unit price, purchasing lead-time, and variance on cost structure through optimizing production cost model. This makes producers reach the Optimal Expected Total Cost (OETC) with ref...

Full description

Bibliographic Details
Main Authors: I-Chiang Wang, 王怡強
Other Authors: Victor B. Kreng
Format: Others
Language:zh-TW
Published: 2004
Online Access:http://ndltd.ncl.edu.tw/handle/54552851200592180303
id ndltd-TW-092NCKU5041066
record_format oai_dc
spelling ndltd-TW-092NCKU50410662015-10-13T11:46:40Z http://ndltd.ncl.edu.tw/handle/54552851200592180303 none 生產者以成本為導向之供應商選擇策略-以軟式印刷電路板製造廠為例 I-Chiang Wang 王怡強 博士 國立成功大學 工業管理科學系碩博士班 92 This research provides manufacturers with the effects of different suppliers’ unit price, purchasing lead-time, and variance on cost structure through optimizing production cost model. This makes producers reach the Optimal Expected Total Cost (OETC) with reference to every kind of cost during production process besides purchasing cost. The consideration of total production cost includes expected raw material cost, expected relevant inventory cost, setup cost, expected capacity cost, and transportation cost. The research compares the cost of different suppliers based on the same Expected Delivery Time (EDT), including expected lead-time of purchasing, expected lead-time of manufacturing, and lead-time of transportation. It was founded in this study that the expected purchasing lead-time and the variances are impacting relevant expected inventory cost. On the other hand, the expected manufacturing lead-time would leads to higher expected capacity cost. The longer the expected manufacturing lead-time is, the lower the expected capacity cost will be. Transportation lead-time affects the transportation cost. The longer the transportation lead-time is, the lower the transportation will be. This research takes a manufacturer of Flexible Printed Circuits Board (FPCB) in Cianjhen Export Zone at Kaohsiung as an example for cost model and arrives at the following conclusions: (1) Instead of just concerning unit price, expected purchasing lead-time, or variance only, the Optimal Expected Total Cost (OETC) should be the criterion of supplier selection, and (2) there exists a trade-off relationship between expected capacity cost and transportation cost. Victor B. Kreng 耿伯文 2004 學位論文 ; thesis 81 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 博士 === 國立成功大學 === 工業管理科學系碩博士班 === 92 === This research provides manufacturers with the effects of different suppliers’ unit price, purchasing lead-time, and variance on cost structure through optimizing production cost model. This makes producers reach the Optimal Expected Total Cost (OETC) with reference to every kind of cost during production process besides purchasing cost. The consideration of total production cost includes expected raw material cost, expected relevant inventory cost, setup cost, expected capacity cost, and transportation cost. The research compares the cost of different suppliers based on the same Expected Delivery Time (EDT), including expected lead-time of purchasing, expected lead-time of manufacturing, and lead-time of transportation. It was founded in this study that the expected purchasing lead-time and the variances are impacting relevant expected inventory cost. On the other hand, the expected manufacturing lead-time would leads to higher expected capacity cost. The longer the expected manufacturing lead-time is, the lower the expected capacity cost will be. Transportation lead-time affects the transportation cost. The longer the transportation lead-time is, the lower the transportation will be. This research takes a manufacturer of Flexible Printed Circuits Board (FPCB) in Cianjhen Export Zone at Kaohsiung as an example for cost model and arrives at the following conclusions: (1) Instead of just concerning unit price, expected purchasing lead-time, or variance only, the Optimal Expected Total Cost (OETC) should be the criterion of supplier selection, and (2) there exists a trade-off relationship between expected capacity cost and transportation cost.
author2 Victor B. Kreng
author_facet Victor B. Kreng
I-Chiang Wang
王怡強
author I-Chiang Wang
王怡強
spellingShingle I-Chiang Wang
王怡強
none
author_sort I-Chiang Wang
title none
title_short none
title_full none
title_fullStr none
title_full_unstemmed none
title_sort none
publishDate 2004
url http://ndltd.ncl.edu.tw/handle/54552851200592180303
work_keys_str_mv AT ichiangwang none
AT wángyíqiáng none
AT ichiangwang shēngchǎnzhěyǐchéngběnwèidǎoxiàngzhīgōngyīngshāngxuǎnzécèlüèyǐruǎnshìyìnshuādiànlùbǎnzhìzàochǎngwèilì
AT wángyíqiáng shēngchǎnzhěyǐchéngběnwèidǎoxiàngzhīgōngyīngshāngxuǎnzécèlüèyǐruǎnshìyìnshuādiànlùbǎnzhìzàochǎngwèilì
_version_ 1716847799004299264