Summary: | 碩士 === 國立成功大學 === 建築學系專班 === 92 === Mortar work is a very important process in build-finishing construction. In today’s construction automation trend, mortar projection work method has been promoted for many years. It is mainly suitable for exterior smooth wall and there are some limits for it. As for the interior wall , traditional mortar working method is widely used. However, there are fewer studies about traditional mortar work. This process was aimed at the process of traditional mortar working method. The study subjects were aimed at interior walls in single houses in Tainan Area.By way of cases study, talk with experts, five minutes evaluation and recording the scenes by cameras to write down the observed data, to give some advice to the thesis about arranging the working power group、man and material analysis、and mortar construction specification, and after that by doing tests to verify the answers.After that, we can say that the best working group was combined by 5 main man power and 3 weak man power. As for the man and material analysis list, after analyzing the mortar made cost and loss component, we can propose a better man and material analysis list about main and weak man power rate and material loss list.By drawing the working process,suggesting the subcontract of mortar made work at first and giving some advice to construction specification as a result of observing and interviewing. Wish this study can build proper material analysis list and improve the productivity of traditional mortar working method to provide the construction department of the government and other people some references.
|