Calculation Methods for Maximum and Minimum Short Circuit Currents of Taipower Transmission System

碩士 === 國立清華大學 === 電機工程學系 === 92 === This thesis presents the methodologies, tailored to the Taipower system, for calculating the maximum and the minimum three-phase short-circuit currents (SCC). By referring to the Korea、the Kyushu and the Kansai electric utilities, which have systems similar to Ta...

Full description

Bibliographic Details
Main Authors: Liu Pei Ming, 劉培民
Other Authors: Shi-Lin Chen
Format: Others
Language:zh-TW
Published: 2004
Online Access:http://ndltd.ncl.edu.tw/handle/60057148119550412538
id ndltd-TW-092NTHU5442013
record_format oai_dc
spelling ndltd-TW-092NTHU54420132015-10-13T13:08:03Z http://ndltd.ncl.edu.tw/handle/60057148119550412538 Calculation Methods for Maximum and Minimum Short Circuit Currents of Taipower Transmission System 台電輸電系統最大及最小短路電流計算方法 Liu Pei Ming 劉培民 碩士 國立清華大學 電機工程學系 92 This thesis presents the methodologies, tailored to the Taipower system, for calculating the maximum and the minimum three-phase short-circuit currents (SCC). By referring to the Korea、the Kyushu and the Kansai electric utilities, which have systems similar to Taipower, we compare the calculation rules of these three power utilities with the rules of Taipower and test all rules numerically on the same Taipower system data. Based on the numerical results, the thesis suggests revisions to the Taipower calculation rules. With respect to the maximum SCC, the thesis compares Taipower’s calculation rules with the IEC and IEEE as well as with the draft document(ER G74) proposed by the British power industry. The comparison accounts for all the influential factors on the calculation of the maximum SCC, such as decaying dc, decaying ac, the contact parting time for circuit breaker, voltage factor etc.. According to the numerical test results, the calculation formula for the decaying dc, adopted presently by Taipower, is acceptably close to that by the IEEE standard. The numerical comparison of Taipower rules with those of the above three power utilities further demonstrates the necessity of revising Taipower rules for a reduction on the maximum SCC values. As to the calculation for the minimum SCC, the thesis suggests the use of system SCC corresponding to the cumulative probability at 5% for the system hourly load distribution, as the minimum SCC for the year under evaluation. For comparison, the thesis also calculates the SCC on basis of Taipower’s present rules which accounts for the disconnection of system generators and transmission lines and transformers. The numerical comparison of Taipower rules with those of Korea、Kyushu and Kansai reveals that the SCC values resulted from Taipower rules, are among the highest of the four power utilities. Thus the thesis suggests Taipower revise the present rules by adopting the aforementioned SCC calculation approach which is based on the 5% probability for the system hourly load distribution throughout the year for calculation of the yearly minimum SCC. Before making this suggestion, we had surveyed the hourly SCC distribution throughout the year and denoted the SCC corresponding to the cumulative probability at 5% for the distribution as ISC,5%. The above suggestion has been made after comparing the ISC,5% with the SCC calculated on basis of the minimum(5%) load. In addition to the primary transmission, this thesis also presents the results of numerical analysis on the calculation of minimum SCC for the secondary transmission system. On basis of the results, we then make suggestions on the present Taipower rules for the minimum SCC calculation for the secondary transmission system. Shi-Lin Chen 陳士麟 2004 學位論文 ; thesis 111 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立清華大學 === 電機工程學系 === 92 === This thesis presents the methodologies, tailored to the Taipower system, for calculating the maximum and the minimum three-phase short-circuit currents (SCC). By referring to the Korea、the Kyushu and the Kansai electric utilities, which have systems similar to Taipower, we compare the calculation rules of these three power utilities with the rules of Taipower and test all rules numerically on the same Taipower system data. Based on the numerical results, the thesis suggests revisions to the Taipower calculation rules. With respect to the maximum SCC, the thesis compares Taipower’s calculation rules with the IEC and IEEE as well as with the draft document(ER G74) proposed by the British power industry. The comparison accounts for all the influential factors on the calculation of the maximum SCC, such as decaying dc, decaying ac, the contact parting time for circuit breaker, voltage factor etc.. According to the numerical test results, the calculation formula for the decaying dc, adopted presently by Taipower, is acceptably close to that by the IEEE standard. The numerical comparison of Taipower rules with those of the above three power utilities further demonstrates the necessity of revising Taipower rules for a reduction on the maximum SCC values. As to the calculation for the minimum SCC, the thesis suggests the use of system SCC corresponding to the cumulative probability at 5% for the system hourly load distribution, as the minimum SCC for the year under evaluation. For comparison, the thesis also calculates the SCC on basis of Taipower’s present rules which accounts for the disconnection of system generators and transmission lines and transformers. The numerical comparison of Taipower rules with those of Korea、Kyushu and Kansai reveals that the SCC values resulted from Taipower rules, are among the highest of the four power utilities. Thus the thesis suggests Taipower revise the present rules by adopting the aforementioned SCC calculation approach which is based on the 5% probability for the system hourly load distribution throughout the year for calculation of the yearly minimum SCC. Before making this suggestion, we had surveyed the hourly SCC distribution throughout the year and denoted the SCC corresponding to the cumulative probability at 5% for the distribution as ISC,5%. The above suggestion has been made after comparing the ISC,5% with the SCC calculated on basis of the minimum(5%) load. In addition to the primary transmission, this thesis also presents the results of numerical analysis on the calculation of minimum SCC for the secondary transmission system. On basis of the results, we then make suggestions on the present Taipower rules for the minimum SCC calculation for the secondary transmission system.
author2 Shi-Lin Chen
author_facet Shi-Lin Chen
Liu Pei Ming
劉培民
author Liu Pei Ming
劉培民
spellingShingle Liu Pei Ming
劉培民
Calculation Methods for Maximum and Minimum Short Circuit Currents of Taipower Transmission System
author_sort Liu Pei Ming
title Calculation Methods for Maximum and Minimum Short Circuit Currents of Taipower Transmission System
title_short Calculation Methods for Maximum and Minimum Short Circuit Currents of Taipower Transmission System
title_full Calculation Methods for Maximum and Minimum Short Circuit Currents of Taipower Transmission System
title_fullStr Calculation Methods for Maximum and Minimum Short Circuit Currents of Taipower Transmission System
title_full_unstemmed Calculation Methods for Maximum and Minimum Short Circuit Currents of Taipower Transmission System
title_sort calculation methods for maximum and minimum short circuit currents of taipower transmission system
publishDate 2004
url http://ndltd.ncl.edu.tw/handle/60057148119550412538
work_keys_str_mv AT liupeiming calculationmethodsformaximumandminimumshortcircuitcurrentsoftaipowertransmissionsystem
AT liúpéimín calculationmethodsformaximumandminimumshortcircuitcurrentsoftaipowertransmissionsystem
AT liupeiming táidiànshūdiànxìtǒngzuìdàjízuìxiǎoduǎnlùdiànliújìsuànfāngfǎ
AT liúpéimín táidiànshūdiànxìtǒngzuìdàjízuìxiǎoduǎnlùdiànliújìsuànfāngfǎ
_version_ 1717732167332659200