A Study on Project Execution Performance Evaluation of Construction Engineering -Testing Feasibility of PDRI Model
碩士 === 國立雲林科技大學 === 營建工程系碩士班 === 92 === Past research was shown that most public projects (about 50%) incur schedule delay, cost overrun and inferior quality. The evaluation method, which is using to organization of construction company for projects, is only for normal delivery system but not enough...
Main Authors: | Chia-hao Hsu, 許家豪 |
---|---|
Other Authors: | none |
Format: | Others |
Language: | zh-TW |
Published: |
2004
|
Online Access: | http://ndltd.ncl.edu.tw/handle/55530398223115295147 |
Similar Items
-
A Study on Project Execution Performance Evaluation of Construction Engineering -Testing Feasibility of PDRI Model
by: Chia-hao Hsu, et al. -
Applying the PDRI in project risk management
by: Wang, Yu-ren
Published: (2008) -
Applying Project Definition Rating Index(PDRI)to Predict Building Project Performance.
by: Chung-Ying YU, et al.
Published: (2010) -
Development of the Project Definition Rating Index (PDRI) for Infrastructure Projects
Published: (2010) -
Development of the Project Definition Rating Index (PDRI) for Small Infrastructure Projects
Published: (2017)