An Establishment Of Distance Monitor Platform For Virtual Tooling Factory
碩士 === 中原大學 === 機械工程研究所 === 93 === Green Design is a “ Must” policy on developing product and tool. The target is to create zero waste, while next is to reduce to a limited waste and its volume. This thesis develop a complete new concept platform of four tier schedules co-operate with color-coded wa...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/74406033223198685079 |
id |
ndltd-TW-093CYCU5489027 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-093CYCU54890272015-10-13T15:06:51Z http://ndltd.ncl.edu.tw/handle/74406033223198685079 An Establishment Of Distance Monitor Platform For Virtual Tooling Factory 虛擬實體模具廠遠距監控管理平台之建置 Yuing Chang 張英 碩士 中原大學 機械工程研究所 93 Green Design is a “ Must” policy on developing product and tool. The target is to create zero waste, while next is to reduce to a limited waste and its volume. This thesis develop a complete new concept platform of four tier schedules co-operate with color-coded warning control of 2D “Explosive mold parts drawing” as an managing tool of “Visual management” is a pioneering innovation in mold making industry. On time delivery by “Do the right thing in the first time” and the aim to cut down the loss of time, energy and cost by abnormal and unnecessary engineering change( EC) through early involvement strategy and mutual communication among customer, mold designer and manufacturer through a Distance Monitor Platform will result a common consensus to prevent repeated errors during mold making and mold trial, meanwhile to improve quality and efficiency at the moment of mold start to design. Customer monitors the mold parts quality and update status by digital videos and pictures together with control forms and sheets during mold making through Platform. He can make the “real time decision” if tool problem occurs, thus a great improve the mold making efficiency and simplify the management of production flow. Non-concurrent computer simulation of finished developing digital files will shorten junior’s mold make learning time and teach them don’t follow the repeated errors. It takes 4 to 6 hours to edit 1st tool schedule on Project 2003, as well as edit by manual. While it save huge modify time under EC and schedule conflict of machine and resource. It takes 75% time off hereafter the 2nd tool of similar pattern by modify the discrepancy data on last tool template. New schedule is reality and has inter-connection with four tier schedules. Shia Chung S.Chen 陳夏宗 2005 學位論文 ; thesis 140 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 中原大學 === 機械工程研究所 === 93 === Green Design is a “ Must” policy on developing product and tool. The target is to create zero waste, while next is to reduce to a limited waste and its volume. This thesis develop a complete new concept platform of four tier schedules co-operate with color-coded warning control of 2D “Explosive mold parts drawing” as an managing tool of “Visual management” is a pioneering innovation in mold making industry.
On time delivery by “Do the right thing in the first time” and the aim to cut down the loss of time, energy and cost by abnormal and unnecessary engineering change( EC) through early involvement strategy and mutual communication among customer, mold designer and manufacturer through a Distance Monitor Platform will result a common consensus to prevent repeated errors during mold making and mold trial, meanwhile to improve quality and efficiency at the moment of mold start to design.
Customer monitors the mold parts quality and update status by digital videos and pictures together with control forms and sheets during mold making through Platform. He can make the “real time decision” if tool problem occurs, thus a great improve the mold making efficiency and simplify the management of production flow. Non-concurrent computer simulation of finished developing digital files will shorten junior’s mold make learning time and teach them don’t follow the repeated errors.
It takes 4 to 6 hours to edit 1st tool schedule on Project 2003, as well as edit by manual. While it save huge modify time under EC and schedule conflict of machine and resource. It takes 75% time off hereafter the 2nd tool of similar pattern by modify the discrepancy data on last tool template. New schedule is reality and has inter-connection with four tier schedules.
|
author2 |
Shia Chung S.Chen |
author_facet |
Shia Chung S.Chen Yuing Chang 張英 |
author |
Yuing Chang 張英 |
spellingShingle |
Yuing Chang 張英 An Establishment Of Distance Monitor Platform For Virtual Tooling Factory |
author_sort |
Yuing Chang |
title |
An Establishment Of Distance Monitor Platform For Virtual Tooling Factory |
title_short |
An Establishment Of Distance Monitor Platform For Virtual Tooling Factory |
title_full |
An Establishment Of Distance Monitor Platform For Virtual Tooling Factory |
title_fullStr |
An Establishment Of Distance Monitor Platform For Virtual Tooling Factory |
title_full_unstemmed |
An Establishment Of Distance Monitor Platform For Virtual Tooling Factory |
title_sort |
establishment of distance monitor platform for virtual tooling factory |
publishDate |
2005 |
url |
http://ndltd.ncl.edu.tw/handle/74406033223198685079 |
work_keys_str_mv |
AT yuingchang anestablishmentofdistancemonitorplatformforvirtualtoolingfactory AT zhāngyīng anestablishmentofdistancemonitorplatformforvirtualtoolingfactory AT yuingchang xūnǐshítǐmójùchǎngyuǎnjùjiānkòngguǎnlǐpíngtáizhījiànzhì AT zhāngyīng xūnǐshítǐmójùchǎngyuǎnjùjiānkòngguǎnlǐpíngtáizhījiànzhì AT yuingchang establishmentofdistancemonitorplatformforvirtualtoolingfactory AT zhāngyīng establishmentofdistancemonitorplatformforvirtualtoolingfactory |
_version_ |
1717761880699699200 |