A Study of the Project Management Application” Projects of Supervision and Counseling of Townscape”-Referring to the Example in Chiayi Area.

碩士 === 大葉大學 === 設計研究所 === 93 === Due to the downturn of living quality as well as the environment in recent years, the government is promoting various development projects for advancing the quality of life in towns and counties. Upon developing the plans, several problems appea...

Full description

Bibliographic Details
Main Authors: TSAI MING FENG, 蔡明峰
Other Authors: HUANG CHUN HSI
Format: Others
Language:zh-TW
Published: 2005
Online Access:http://ndltd.ncl.edu.tw/handle/27015706048457087279
id ndltd-TW-093DYU00619005
record_format oai_dc
spelling ndltd-TW-093DYU006190052016-06-13T04:17:02Z http://ndltd.ncl.edu.tw/handle/27015706048457087279 A Study of the Project Management Application” Projects of Supervision and Counseling of Townscape”-Referring to the Example in Chiayi Area. 專案管理應用於城鄉風貌督導顧問機制之探討-以嘉義縣為例 TSAI MING FENG 蔡明峰 碩士 大葉大學 設計研究所 93 Due to the downturn of living quality as well as the environment in recent years, the government is promoting various development projects for advancing the quality of life in towns and counties. Upon developing the plans, several problems appeared. For example, gradation implementation cannot meet its goals and there is recognition difference among the participating units as well as no creative and progressive suggestions from the participants particularly from the viewpoint of environmental vision and sustainable concept (most of the projects still follow traditional-oriented engineering). There is no professional integration capability between the governmental units. As a result, the Construction and Planning Agency, Ministry of the Interior has proposed the Supervision and Counseling of Townscape Renaissance Project. Several consulting teams were established and the field research was implemented. The studies helped the local government to supervise and counsel relevant cases and the desired effect has been achieved. Unfortunately, some policies and procedures, upon implementation, need to be improved. The problems caused are mostly due to the concept and operation. This study’s goal is to understand the process and effect of the project implementation. It is taken as a basis and management concepts are applied to determine the assignment, procedure and extra attention in various periods. The Professional Construction Management, an engineering system, is used as the main management example. Its key frame has been transformed into a proper management process and evaluation system for the supervising project. Cases in the Jiayi area were analyzed and related proposals were recommended. The Balanced Scorecard was used as the evaluation tool since it is commonly used to appraise a public unit. The evaluating index and items were created by using the two factors that the implementing effect is expected to promote. This study can be a reference for improving the style of a town or county as well as for sustainability development projects. HUANG CHUN HSI 黃俊熹 2005 學位論文 ; thesis 189 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 大葉大學 === 設計研究所 === 93 === Due to the downturn of living quality as well as the environment in recent years, the government is promoting various development projects for advancing the quality of life in towns and counties. Upon developing the plans, several problems appeared. For example, gradation implementation cannot meet its goals and there is recognition difference among the participating units as well as no creative and progressive suggestions from the participants particularly from the viewpoint of environmental vision and sustainable concept (most of the projects still follow traditional-oriented engineering). There is no professional integration capability between the governmental units. As a result, the Construction and Planning Agency, Ministry of the Interior has proposed the Supervision and Counseling of Townscape Renaissance Project. Several consulting teams were established and the field research was implemented. The studies helped the local government to supervise and counsel relevant cases and the desired effect has been achieved. Unfortunately, some policies and procedures, upon implementation, need to be improved. The problems caused are mostly due to the concept and operation. This study’s goal is to understand the process and effect of the project implementation. It is taken as a basis and management concepts are applied to determine the assignment, procedure and extra attention in various periods. The Professional Construction Management, an engineering system, is used as the main management example. Its key frame has been transformed into a proper management process and evaluation system for the supervising project. Cases in the Jiayi area were analyzed and related proposals were recommended. The Balanced Scorecard was used as the evaluation tool since it is commonly used to appraise a public unit. The evaluating index and items were created by using the two factors that the implementing effect is expected to promote. This study can be a reference for improving the style of a town or county as well as for sustainability development projects.
author2 HUANG CHUN HSI
author_facet HUANG CHUN HSI
TSAI MING FENG
蔡明峰
author TSAI MING FENG
蔡明峰
spellingShingle TSAI MING FENG
蔡明峰
A Study of the Project Management Application” Projects of Supervision and Counseling of Townscape”-Referring to the Example in Chiayi Area.
author_sort TSAI MING FENG
title A Study of the Project Management Application” Projects of Supervision and Counseling of Townscape”-Referring to the Example in Chiayi Area.
title_short A Study of the Project Management Application” Projects of Supervision and Counseling of Townscape”-Referring to the Example in Chiayi Area.
title_full A Study of the Project Management Application” Projects of Supervision and Counseling of Townscape”-Referring to the Example in Chiayi Area.
title_fullStr A Study of the Project Management Application” Projects of Supervision and Counseling of Townscape”-Referring to the Example in Chiayi Area.
title_full_unstemmed A Study of the Project Management Application” Projects of Supervision and Counseling of Townscape”-Referring to the Example in Chiayi Area.
title_sort study of the project management application” projects of supervision and counseling of townscape”-referring to the example in chiayi area.
publishDate 2005
url http://ndltd.ncl.edu.tw/handle/27015706048457087279
work_keys_str_mv AT tsaimingfeng astudyoftheprojectmanagementapplicationprojectsofsupervisionandcounselingoftownscapereferringtotheexampleinchiayiarea
AT càimíngfēng astudyoftheprojectmanagementapplicationprojectsofsupervisionandcounselingoftownscapereferringtotheexampleinchiayiarea
AT tsaimingfeng zhuānànguǎnlǐyīngyòngyúchéngxiāngfēngmàodūdǎogùwènjīzhìzhītàntǎoyǐjiāyìxiànwèilì
AT càimíngfēng zhuānànguǎnlǐyīngyòngyúchéngxiāngfēngmàodūdǎogùwènjīzhìzhītàntǎoyǐjiāyìxiànwèilì
AT tsaimingfeng studyoftheprojectmanagementapplicationprojectsofsupervisionandcounselingoftownscapereferringtotheexampleinchiayiarea
AT càimíngfēng studyoftheprojectmanagementapplicationprojectsofsupervisionandcounselingoftownscapereferringtotheexampleinchiayiarea
_version_ 1718303371568349184