Research on the National Compensation Issues for the Provincial Highway Construction

碩士 === 逢甲大學 === 交通工程與管理所 === 93 === The Highway consist of the roads used by vehicles and the other public infrastructure facilities around it, which include the road of Nation, Province, Hsien, Hsiang and Special use . The roads that lack of well management and poor facilities usually cause the g...

Full description

Bibliographic Details
Main Authors: Guan-Zhang Ho, 何冠章
Other Authors: Yao-Tsz Hsu
Format: Others
Language:zh-TW
Published: 2005
Online Access:http://ndltd.ncl.edu.tw/handle/43793355323588923814
id ndltd-TW-093FCU05118005
record_format oai_dc
spelling ndltd-TW-093FCU051180052015-10-13T11:20:16Z http://ndltd.ncl.edu.tw/handle/43793355323588923814 Research on the National Compensation Issues for the Provincial Highway Construction 省道建設引發國家賠償問題之研究 Guan-Zhang Ho 何冠章 碩士 逢甲大學 交通工程與管理所 93 The Highway consist of the roads used by vehicles and the other public infrastructure facilities around it, which include the road of Nation, Province, Hsien, Hsiang and Special use . The roads that lack of well management and poor facilities usually cause the government compensation case. On 2004 October 27th, the legislators adjourn the budget of the MOTC (Ministry of Transportation and Communication).They found the government compensation cases had become the cost priority . They decided adjourn the budget of department of transportation. So , The government compensation becomes more and more important problem for us to solve it. In order to solve these situations , the study collects lots of cases and comes to some conclusions . Firstly , we divide the reasons into 6 categories. There are the factor of rock fall , bridge, surface of road, barrow pit , trees beside the road , traffic sign and so on . Secondly , we suggest six categories of 18 actions to solve them. Nowadays , to do these actions we are limited by the budget, however. So , this study uses the fuzzy AHP( Analytic Hierarchy Process ,AHP) method to evaluate the actions priority. The frames of references are technology, policy, economy and 11 sub-references. According to the results of this study, the conclusions are as the followings. 1. The priority of progress alternative of rock fall factor is increasing the audit trail in distressed area. 2. The priority of progress alternative of bridge factor is stronger designing. 3. The priority of progress alternative of surface of road factor is increasing the auditing trail after the rains and repairing immediately. 4. The priority of progress alternative of barrow pit factor is keeping flowing. 5. The priority of progress alternative of trees beside the road factor is sending blasted branch. 6. The priority of progress alternative of traffic sign factor is increasing management of a general contractor. The contributions of this study are setting up a flow to evaluate the actions priority under the budget limitation. Yao-Tsz Hsu 徐耀賜 2005 學位論文 ; thesis 191 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 逢甲大學 === 交通工程與管理所 === 93 === The Highway consist of the roads used by vehicles and the other public infrastructure facilities around it, which include the road of Nation, Province, Hsien, Hsiang and Special use . The roads that lack of well management and poor facilities usually cause the government compensation case. On 2004 October 27th, the legislators adjourn the budget of the MOTC (Ministry of Transportation and Communication).They found the government compensation cases had become the cost priority . They decided adjourn the budget of department of transportation. So , The government compensation becomes more and more important problem for us to solve it. In order to solve these situations , the study collects lots of cases and comes to some conclusions . Firstly , we divide the reasons into 6 categories. There are the factor of rock fall , bridge, surface of road, barrow pit , trees beside the road , traffic sign and so on . Secondly , we suggest six categories of 18 actions to solve them. Nowadays , to do these actions we are limited by the budget, however. So , this study uses the fuzzy AHP( Analytic Hierarchy Process ,AHP) method to evaluate the actions priority. The frames of references are technology, policy, economy and 11 sub-references. According to the results of this study, the conclusions are as the followings. 1. The priority of progress alternative of rock fall factor is increasing the audit trail in distressed area. 2. The priority of progress alternative of bridge factor is stronger designing. 3. The priority of progress alternative of surface of road factor is increasing the auditing trail after the rains and repairing immediately. 4. The priority of progress alternative of barrow pit factor is keeping flowing. 5. The priority of progress alternative of trees beside the road factor is sending blasted branch. 6. The priority of progress alternative of traffic sign factor is increasing management of a general contractor. The contributions of this study are setting up a flow to evaluate the actions priority under the budget limitation.
author2 Yao-Tsz Hsu
author_facet Yao-Tsz Hsu
Guan-Zhang Ho
何冠章
author Guan-Zhang Ho
何冠章
spellingShingle Guan-Zhang Ho
何冠章
Research on the National Compensation Issues for the Provincial Highway Construction
author_sort Guan-Zhang Ho
title Research on the National Compensation Issues for the Provincial Highway Construction
title_short Research on the National Compensation Issues for the Provincial Highway Construction
title_full Research on the National Compensation Issues for the Provincial Highway Construction
title_fullStr Research on the National Compensation Issues for the Provincial Highway Construction
title_full_unstemmed Research on the National Compensation Issues for the Provincial Highway Construction
title_sort research on the national compensation issues for the provincial highway construction
publishDate 2005
url http://ndltd.ncl.edu.tw/handle/43793355323588923814
work_keys_str_mv AT guanzhangho researchonthenationalcompensationissuesfortheprovincialhighwayconstruction
AT héguānzhāng researchonthenationalcompensationissuesfortheprovincialhighwayconstruction
AT guanzhangho shěngdàojiànshèyǐnfāguójiāpéichángwèntízhīyánjiū
AT héguānzhāng shěngdàojiànshèyǐnfāguójiāpéichángwèntízhīyánjiū
_version_ 1716840953309822976