On Multiple Objectives Production Scheduling – Including Regular and Non-regular Performance Measures

碩士 === 輔仁大學 === 管理學研究所 === 93 === An excellent operations scheduling can reduces production cost by arranging the orders. To consider multiple objectives production scheduling can fulfill the complexity requirement of management. So, to consider multiple objectives production scheduling is necessary...

Full description

Bibliographic Details
Main Authors: Meng-Feng Li, 李孟峰
Other Authors: Rong-Hwa Huang
Format: Others
Language:zh-TW
Published: 2005
Online Access:http://ndltd.ncl.edu.tw/handle/54732487292640253182
id ndltd-TW-093FJU00457018
record_format oai_dc
spelling ndltd-TW-093FJU004570182016-06-08T04:13:34Z http://ndltd.ncl.edu.tw/handle/54732487292640253182 On Multiple Objectives Production Scheduling – Including Regular and Non-regular Performance Measures 多目標之生產排程研究-含規則性與非規則性衡量準則 Meng-Feng Li 李孟峰 碩士 輔仁大學 管理學研究所 93 An excellent operations scheduling can reduces production cost by arranging the orders. To consider multiple objectives production scheduling can fulfill the complexity requirement of management. So, to consider multiple objectives production scheduling is necessary. The performance measure including regular and non-regular, it can be use to measure scheduling. In the past, almost scholars consider regular performance measure in scheduling problems. Recently, since the concept of JIT (Just In Time) had taken into consideration, so to consider both regular and non-regular performances measures on scheduling are necessary in JIT production system. Because JIT requires that the production system must to reduce in-process inventory and finished inventory. In other words, the manager must to consider both the total flowtime and maximum earliness performance measures on the scheduling. The study presents the algorithms and shows two problems can be solved. One problem is to minimize flowtime subject to given maximum earliness on single machine. Second problem is to minimize flowtime and maximum earliness on a single machine. The computational results show that the algorithms can get the optimal solution in tiny time. Rong-Hwa Huang 黃榮華 2005 學位論文 ; thesis 34 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 輔仁大學 === 管理學研究所 === 93 === An excellent operations scheduling can reduces production cost by arranging the orders. To consider multiple objectives production scheduling can fulfill the complexity requirement of management. So, to consider multiple objectives production scheduling is necessary. The performance measure including regular and non-regular, it can be use to measure scheduling. In the past, almost scholars consider regular performance measure in scheduling problems. Recently, since the concept of JIT (Just In Time) had taken into consideration, so to consider both regular and non-regular performances measures on scheduling are necessary in JIT production system. Because JIT requires that the production system must to reduce in-process inventory and finished inventory. In other words, the manager must to consider both the total flowtime and maximum earliness performance measures on the scheduling. The study presents the algorithms and shows two problems can be solved. One problem is to minimize flowtime subject to given maximum earliness on single machine. Second problem is to minimize flowtime and maximum earliness on a single machine. The computational results show that the algorithms can get the optimal solution in tiny time.
author2 Rong-Hwa Huang
author_facet Rong-Hwa Huang
Meng-Feng Li
李孟峰
author Meng-Feng Li
李孟峰
spellingShingle Meng-Feng Li
李孟峰
On Multiple Objectives Production Scheduling – Including Regular and Non-regular Performance Measures
author_sort Meng-Feng Li
title On Multiple Objectives Production Scheduling – Including Regular and Non-regular Performance Measures
title_short On Multiple Objectives Production Scheduling – Including Regular and Non-regular Performance Measures
title_full On Multiple Objectives Production Scheduling – Including Regular and Non-regular Performance Measures
title_fullStr On Multiple Objectives Production Scheduling – Including Regular and Non-regular Performance Measures
title_full_unstemmed On Multiple Objectives Production Scheduling – Including Regular and Non-regular Performance Measures
title_sort on multiple objectives production scheduling – including regular and non-regular performance measures
publishDate 2005
url http://ndltd.ncl.edu.tw/handle/54732487292640253182
work_keys_str_mv AT mengfengli onmultipleobjectivesproductionschedulingincludingregularandnonregularperformancemeasures
AT lǐmèngfēng onmultipleobjectivesproductionschedulingincludingregularandnonregularperformancemeasures
AT mengfengli duōmùbiāozhīshēngchǎnpáichéngyánjiūhánguīzéxìngyǔfēiguīzéxìnghéngliàngzhǔnzé
AT lǐmèngfēng duōmùbiāozhīshēngchǎnpáichéngyánjiūhánguīzéxìngyǔfēiguīzéxìnghéngliàngzhǔnzé
_version_ 1718297548446236672