A Model for Optimal Engineer Allocation of Construction Project
碩士 === 國立中央大學 === 土木工程學系碩士在職專班 === 93 === This research is to builds work site of control manpower the project to assign the plan to do the policy-making model research, first to generally builds the company manpower dispatch decision-making the Work site administrator average month output value &qu...
Main Authors: | Ming-Chih Chien, 簡明智 |
---|---|
Other Authors: | Shang-Yao Yan |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/30325352548349592300 |
Similar Items
-
The Research of Construction Management in Shorten Activity within Water-Supply Engineering Project
by: Ming-Chih Chiang, et al.
Published: (2010) -
Engineer Resource On-Site Allocation Inference Model in Construction Project For Building
by: Ming-Dung Huang, et al.
Published: (2017) -
Establishing engineering S-curves to evaluate supervision engineer allocations for highway construction projects
by: Shih-Hsu Wang, et al.
Published: (2016-07-01) -
Engineer Resource Allocation for Construction Project Using ANP Method
by: Chia Hao Lin, et al.
Published: (2003) -
Personnel Allocation for Engineering Projects
by: Theron, Louis Francois
Published: (2014)