Quality Control of Design and Construction Stage in Military Engineering and Operation Maintenance

碩士 === 國立臺北科技大學 === 土木與防災研究所 === 93 === Military is the main strength of each country''s stability. Every military investment is the main source to maintain military''s strength. The intention of military engineering and operation maintenance is to support the war preparedness ta...

Full description

Bibliographic Details
Main Authors: Lin, Ching, 林慶
Other Authors: 林利國
Format: Others
Language:zh-TW
Published: 2005
Online Access:http://ndltd.ncl.edu.tw/handle/2hm68y
Description
Summary:碩士 === 國立臺北科技大學 === 土木與防災研究所 === 93 === Military is the main strength of each country''s stability. Every military investment is the main source to maintain military''s strength. The intention of military engineering and operation maintenance is to support the war preparedness task effectively and to guarantee the whole country''s security. However, under the consideration of the government policy, the unit responsibility for the military engineering and operation maintenance must be reduced with its dimension gradually . It results in the deficiency of professional engineer, besides, to cooperate with the fulfillment of government procurement act, the implement of engineer procurement has changed from self planning and designing to entrust planning and designing. Therefore, each plan of military engineering and operation maintenance and the efficiency of construction management is not only concerned with the success or failure of our country''s army''s war preparedness, training and logistics supporting task but also influence the army’s fighting capability. The military engineering and operation maintenance is the foundation of overall construction of the national defense, it’s also a link of government''s public engineering construction, its annually average utilizing budget reaches the figure of approximately10 billion. However, in recent years, the technique services such as design, supervision, turnkey and Project construction management entrusted to the architect that often make mistakes in measurement, drilling, site investment, unsuitable design and inappropriate construction management, etc. at the design stage. All these mistakes made by the architect result in the growing of engineer’s rate of progress lagging behind, poor project quality, altering the original design, engineering dispute. They also cause coordinating, appealing, mediating, arbitrating and lawsuit, etc. between the owner and the contractor. Thus, the mistakes not merely use up a large amount of energy and time, but also delay project progress and budget disbursing. Even more, they extremely influence both the military owner to enter and garrison and war preparedness ability. My research focuses on the analysis and deliberate of the common faults on both design and check before acceptance phase in entrust technique service of military engineering and operation maintenance over the years, to propose a fine quality control of design and construction stage, further, it is a mainspring of this research to guarantee military project quality.