Study of production cycle time for an economic production quantity model with machine breakdowns (AR-policy) and rework
碩士 === 朝陽科技大學 === 工業工程與管理系碩士班 === 94 === This research is concerned with an imperfect economic production quantity (EPQ) model with machine breakdown (Abort/resume–AR) and rework. One of the unrealistic assumptions of classic EPQ model is that it assumes manufacturing facility functions perfectly at...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2006
|
Online Access: | http://ndltd.ncl.edu.tw/handle/38w852 |