Study of production cycle time for an economic production quantity model with machine breakdowns (AR-policy) and rework

碩士 === 朝陽科技大學 === 工業工程與管理系碩士班 === 94 === This research is concerned with an imperfect economic production quantity (EPQ) model with machine breakdown (Abort/resume–AR) and rework. One of the unrealistic assumptions of classic EPQ model is that it assumes manufacturing facility functions perfectly at...

Full description

Bibliographic Details
Main Authors: Wen-Chieh Liu, 劉文傑
Other Authors: Yuan-Shyi Peter Chiu
Format: Others
Language:zh-TW
Published: 2006
Online Access:http://ndltd.ncl.edu.tw/handle/38w852

Similar Items