Progress Control for High Rise Building Construction Projects-Module Establishment and Analysis
碩士 === 義守大學 === 土木與生態工程學系碩士班 === 94 === On-time completion is one of the main objectives in construction projects. However, as scheduling techniques keep on improving, delays happen all the time. Practically, there is a lack of a systematic construction control model” which can be based upon to solv...
Main Authors: | Zhi-Yuan Huang, 黃致遠 |
---|---|
Other Authors: | Kuo-Liang Lin |
Format: | Others |
Language: | zh-TW |
Published: |
2006
|
Online Access: | http://ndltd.ncl.edu.tw/handle/78165968704188382361 |
Similar Items
-
Establishment of Construction Safety Check for High-rise Building
by: Chao-Bin Chen, et al.
Published: (2004) -
Project risk management in the construction of high-rise buildings
by: Titarenko Boris, et al.
Published: (2018-01-01) -
Choosing the rational management of highrise building construction projects
by: Tetiana Kravchunovska, et al.
Published: (2020-06-01) -
Planning and control of high-rise building construction
by: Ranjbaran, Arash
Published: (2007) -
Design and Implementation of Green Construction Scheme for a High-rise Residential Building Project
by: Zhou Yong, et al.
Published: (2018-01-01)