Using Conditional Partial Expected Value towards the Dynamic Estimation of Mean Project Activity Time Under Different Probability Distribution
碩士 === 國立臺北科技大學 === 商業自動化與管理研究所 === 94 === In daily life, there are multitudes of engineering works in project model, in a project schedule often include a lot of activities. Because the project is to use specific resource, manpower, material resources to reach the goal in a most efficient way withi...