Using Conditional Partial Expected Value towards the Dynamic Estimation of Mean Project Activity Time Under Different Probability Distribution

碩士 === 國立臺北科技大學 === 商業自動化與管理研究所 === 94 === In daily life, there are multitudes of engineering works in project model, in a project schedule often include a lot of activities. Because the project is to use specific resource, manpower, material resources to reach the goal in a most efficient way withi...

Full description

Bibliographic Details
Main Authors: Chia-Hsing Wang, 汪家興
Other Authors: 林逾先
Format: Others
Language:zh-TW
Published: 2006
Online Access:http://ndltd.ncl.edu.tw/handle/r4dwbs