Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines
碩士 === 中原大學 === 工業工程研究所 === 95 === This paper considers the identical parallel machines problem, where jobs arrive in batches. The objective is to minimize the total completion time. Since the single machine problem with job arrival time is known to be NP-hard, therefore the problem is NP-hard in th...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/02292190095830243568 |
id |
ndltd-TW-095CYCU5030040 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-095CYCU50300402015-10-13T13:55:57Z http://ndltd.ncl.edu.tw/handle/02292190095830243568 Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines 等效平行機台在工件依批量到達下之最小總完工時間排程問題 Tsui-Ping Chung 鍾翠萍 碩士 中原大學 工業工程研究所 95 This paper considers the identical parallel machines problem, where jobs arrive in batches. The objective is to minimize the total completion time. Since the single machine problem with job arrival time is known to be NP-hard, therefore the problem is NP-hard in the strong sense. A heuristic procedure based on a Binary Integer Programming model to level the completion time of all jobs between two consecutive batch arrival times is developed to decrease the machine idle, which in turn minimize the total job completion time. A branch and bound algorithm is proposed for benchmarking. Computational results show that the solution quality error of the heuristic is at most 6.7%. Ling-Huey Su 蘇玲慧 2007 學位論文 ; thesis 39 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 中原大學 === 工業工程研究所 === 95 === This paper considers the identical parallel machines problem, where jobs arrive in batches. The objective is to minimize the total completion time. Since the single machine problem with job arrival time is known to be NP-hard, therefore the problem is NP-hard in the strong sense. A heuristic procedure based on a Binary Integer Programming model to level the completion time of all jobs between two consecutive batch arrival times is developed to decrease the machine idle, which in turn minimize the total job completion time. A branch and bound algorithm is proposed for benchmarking. Computational results show that the solution quality error of the heuristic is at most 6.7%.
|
author2 |
Ling-Huey Su |
author_facet |
Ling-Huey Su Tsui-Ping Chung 鍾翠萍 |
author |
Tsui-Ping Chung 鍾翠萍 |
spellingShingle |
Tsui-Ping Chung 鍾翠萍 Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines |
author_sort |
Tsui-Ping Chung |
title |
Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines |
title_short |
Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines |
title_full |
Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines |
title_fullStr |
Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines |
title_full_unstemmed |
Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines |
title_sort |
minimizing total flowtime with arrival time in batches on identical parallel machines |
publishDate |
2007 |
url |
http://ndltd.ncl.edu.tw/handle/02292190095830243568 |
work_keys_str_mv |
AT tsuipingchung minimizingtotalflowtimewitharrivaltimeinbatchesonidenticalparallelmachines AT zhōngcuìpíng minimizingtotalflowtimewitharrivaltimeinbatchesonidenticalparallelmachines AT tsuipingchung děngxiàopíngxíngjītáizàigōngjiànyīpīliàngdàodáxiàzhīzuìxiǎozǒngwángōngshíjiānpáichéngwèntí AT zhōngcuìpíng děngxiàopíngxíngjītáizàigōngjiànyīpīliàngdàodáxiàzhīzuìxiǎozǒngwángōngshíjiānpáichéngwèntí |
_version_ |
1717745736022491136 |