Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines

碩士 === 中原大學 === 工業工程研究所 === 95 === This paper considers the identical parallel machines problem, where jobs arrive in batches. The objective is to minimize the total completion time. Since the single machine problem with job arrival time is known to be NP-hard, therefore the problem is NP-hard in th...

Full description

Bibliographic Details
Main Authors: Tsui-Ping Chung, 鍾翠萍
Other Authors: Ling-Huey Su
Format: Others
Language:zh-TW
Published: 2007
Online Access:http://ndltd.ncl.edu.tw/handle/02292190095830243568
id ndltd-TW-095CYCU5030040
record_format oai_dc
spelling ndltd-TW-095CYCU50300402015-10-13T13:55:57Z http://ndltd.ncl.edu.tw/handle/02292190095830243568 Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines 等效平行機台在工件依批量到達下之最小總完工時間排程問題 Tsui-Ping Chung 鍾翠萍 碩士 中原大學 工業工程研究所 95 This paper considers the identical parallel machines problem, where jobs arrive in batches. The objective is to minimize the total completion time. Since the single machine problem with job arrival time is known to be NP-hard, therefore the problem is NP-hard in the strong sense. A heuristic procedure based on a Binary Integer Programming model to level the completion time of all jobs between two consecutive batch arrival times is developed to decrease the machine idle, which in turn minimize the total job completion time. A branch and bound algorithm is proposed for benchmarking. Computational results show that the solution quality error of the heuristic is at most 6.7%. Ling-Huey Su 蘇玲慧 2007 學位論文 ; thesis 39 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 中原大學 === 工業工程研究所 === 95 === This paper considers the identical parallel machines problem, where jobs arrive in batches. The objective is to minimize the total completion time. Since the single machine problem with job arrival time is known to be NP-hard, therefore the problem is NP-hard in the strong sense. A heuristic procedure based on a Binary Integer Programming model to level the completion time of all jobs between two consecutive batch arrival times is developed to decrease the machine idle, which in turn minimize the total job completion time. A branch and bound algorithm is proposed for benchmarking. Computational results show that the solution quality error of the heuristic is at most 6.7%.
author2 Ling-Huey Su
author_facet Ling-Huey Su
Tsui-Ping Chung
鍾翠萍
author Tsui-Ping Chung
鍾翠萍
spellingShingle Tsui-Ping Chung
鍾翠萍
Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines
author_sort Tsui-Ping Chung
title Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines
title_short Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines
title_full Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines
title_fullStr Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines
title_full_unstemmed Minimizing Total Flowtime with Arrival Time in Batches on Identical Parallel Machines
title_sort minimizing total flowtime with arrival time in batches on identical parallel machines
publishDate 2007
url http://ndltd.ncl.edu.tw/handle/02292190095830243568
work_keys_str_mv AT tsuipingchung minimizingtotalflowtimewitharrivaltimeinbatchesonidenticalparallelmachines
AT zhōngcuìpíng minimizingtotalflowtimewitharrivaltimeinbatchesonidenticalparallelmachines
AT tsuipingchung děngxiàopíngxíngjītáizàigōngjiànyīpīliàngdàodáxiàzhīzuìxiǎozǒngwángōngshíjiānpáichéngwèntí
AT zhōngcuìpíng děngxiàopíngxíngjītáizàigōngjiànyīpīliàngdàodáxiàzhīzuìxiǎozǒngwángōngshíjiānpáichéngwèntí
_version_ 1717745736022491136