The Study of Inspected Process of Feeder Synchronized phase For Distribution System
碩士 === 國立高雄應用科技大學 === 電機工程系碩士班 === 95 === According to enhancing stable power supply, it is not allowed to have power cut for the normal maintaining construction. The public expect to reduce power cut time and frequency. Therefore, it is important to use non-outage transfer to decrease power cut tim...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/96727721394051153688 |
id |
ndltd-TW-095KUAS0442057 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-095KUAS04420572015-10-13T16:51:32Z http://ndltd.ncl.edu.tw/handle/96727721394051153688 The Study of Inspected Process of Feeder Synchronized phase For Distribution System 配電系統饋線同步相序檢核程序研究 Sheng-Huei Tsai 蔡勝輝 碩士 國立高雄應用科技大學 電機工程系碩士班 95 According to enhancing stable power supply, it is not allowed to have power cut for the normal maintaining construction. The public expect to reduce power cut time and frequency. Therefore, it is important to use non-outage transfer to decrease power cut times and areas. The process of on-outage transfer is described as bellows. First, two switches of different feeders or different substation are temporarily parallel operated according to the necessary of urgent repair, load adjustment, and regular maintenance. Secondly, around 5 to 10 minutes, another normal-close switch is cut to do unlock operate. Finally, the on-outage transfer is completed if there is no effect on loading power during the process. The key technique to achieve safe on –outage transfer on parallel operating on synchronizing phase. If there is no synchronizing phase on operating on-outage transfer, the feeder will be cut off to enlarge the black-out area and to endanger the working safety of fieldworkers. To sum up, the purpose of this study is to analysis the checking methods of synchronizing phase on the both sides of switches during the on-outage transfer. It is to measure the absolute angle for the checking of synchronizing phase; to make sure the function of on-outage transfer and to develop the effect of on-outage work.. Jong-Ching Hwang 黃鐘慶 2007 學位論文 ; thesis 64 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立高雄應用科技大學 === 電機工程系碩士班 === 95 === According to enhancing stable power supply, it is not allowed to have power cut for the normal maintaining construction. The public expect to reduce power cut time and frequency. Therefore, it is important to use non-outage transfer to decrease power cut times and areas.
The process of on-outage transfer is described as bellows. First, two switches of different feeders or different substation are temporarily parallel operated according to the necessary of urgent repair, load adjustment, and regular maintenance. Secondly, around 5 to 10 minutes, another normal-close switch is cut to do unlock operate. Finally, the on-outage transfer is completed if there is no effect on loading power during the process. The key technique to achieve safe on –outage transfer on parallel operating on synchronizing phase. If there is no synchronizing phase on operating on-outage transfer, the feeder will be cut off to enlarge the black-out area and to endanger the working safety of fieldworkers.
To sum up, the purpose of this study is to analysis the checking methods of synchronizing phase on the both sides of switches during the on-outage transfer. It is to measure the absolute angle for the checking of synchronizing phase; to make sure the function of on-outage transfer and to develop the effect of on-outage work..
|
author2 |
Jong-Ching Hwang |
author_facet |
Jong-Ching Hwang Sheng-Huei Tsai 蔡勝輝 |
author |
Sheng-Huei Tsai 蔡勝輝 |
spellingShingle |
Sheng-Huei Tsai 蔡勝輝 The Study of Inspected Process of Feeder Synchronized phase For Distribution System |
author_sort |
Sheng-Huei Tsai |
title |
The Study of Inspected Process of Feeder Synchronized phase For Distribution System |
title_short |
The Study of Inspected Process of Feeder Synchronized phase For Distribution System |
title_full |
The Study of Inspected Process of Feeder Synchronized phase For Distribution System |
title_fullStr |
The Study of Inspected Process of Feeder Synchronized phase For Distribution System |
title_full_unstemmed |
The Study of Inspected Process of Feeder Synchronized phase For Distribution System |
title_sort |
study of inspected process of feeder synchronized phase for distribution system |
publishDate |
2007 |
url |
http://ndltd.ncl.edu.tw/handle/96727721394051153688 |
work_keys_str_mv |
AT shenghueitsai thestudyofinspectedprocessoffeedersynchronizedphasefordistributionsystem AT càishènghuī thestudyofinspectedprocessoffeedersynchronizedphasefordistributionsystem AT shenghueitsai pèidiànxìtǒngkuìxiàntóngbùxiāngxùjiǎnhéchéngxùyánjiū AT càishènghuī pèidiànxìtǒngkuìxiàntóngbùxiāngxùjiǎnhéchéngxùyánjiū AT shenghueitsai studyofinspectedprocessoffeedersynchronizedphasefordistributionsystem AT càishènghuī studyofinspectedprocessoffeedersynchronizedphasefordistributionsystem |
_version_ |
1717775889386700800 |