Time Window Constrained Batching Scheduling Problem And Its GA-Based Optimization Method
碩士 === 臺灣大學 === 工業工程學研究所 === 95 === This research presents the definition and model of the Time Window Constrained Batching Scheduling Problem. The object of this model is to maximize machine utilization. The problem is subjected to four kinds of constraints. GA-based optimization methods are develo...
Main Authors: | Hsiu-Hui Huang, 黃秀惠 |
---|---|
Other Authors: | 楊烽正 |
Format: | Others |
Language: | zh-TW |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/64807348795310076178 |
Similar Items
-
Ant Colony Optimization Method for Time Window Constrained Batching and Scheduling Problem
by: Yu Hui Hung, et al.
Published: (2007) -
Time Window Constrained Vehicle Routing Problems
by: Shen, Sheng-Yuan, et al.
Published: (1999) -
A study on dynamic batch processor scheduling problem
by: Hui-Mei Wang, et al.
Published: (2004) -
The scheduling problem of batch processing operation in the
by: Chao, Hui-chen, et al.
Published: (1998) -
On job shop scheduling with time window problem
by: Wen Shing-Chen, et al.
Published: (2005)