Development of Material Requirements Planning Information System for Mid-small Size Shipyards

碩士 === 國立臺灣大學 === 工程科學及海洋工程學研究所 === 95 === New ship building is the order-designed process involves a mass-customized production environment that depends on the availability of the manufacturing processes and materials. How to meet a variety of designated materials requested by customers and how to...

Full description

Bibliographic Details
Main Authors: Yun-Lung Lo, 羅雲龍
Other Authors: 郭真祥
Format: Others
Language:zh-TW
Published: 2006
Online Access:http://ndltd.ncl.edu.tw/handle/35433136076842395332
id ndltd-TW-095NTU05345006
record_format oai_dc
spelling ndltd-TW-095NTU053450062015-12-11T04:04:49Z http://ndltd.ncl.edu.tw/handle/35433136076842395332 Development of Material Requirements Planning Information System for Mid-small Size Shipyards 中小型船廠物料需求規劃資訊系統之研發 Yun-Lung Lo 羅雲龍 碩士 國立臺灣大學 工程科學及海洋工程學研究所 95 New ship building is the order-designed process involves a mass-customized production environment that depends on the availability of the manufacturing processes and materials. How to meet a variety of designated materials requested by customers and how to cope with the quick response for confirmed orders will gradually become important issues for mid-small shipyard. It is difficult to calculate the requirement of materials because the correctness of traditional MRP (Material Requirements Planning) method to expand original materials basis on BOM (Bill of Materials). The thesis uses BOP (Bill of Production) integrated by BOM and Routing process to expand requirement of materials to calculate the demand of material items and quantity of every manufacturing process. This thesis develops the web-based production management system using MicroSoft ASP.Net 2.0 to develop the application and using MicroSoft SQL Server 2005 in Database System. Aimed at the demand of reducing operation process, and deploy material resources efficiently, and reducing the material inventory of mid-small shipyard, so select the Material Requirements Planning information System which is import basis part of ERP (Enterprise Resource Planning) to develop. The goals help business to enhance the prepare material ability and operation support ability, which could improve business’s flexibility and competitive edge of mid-small shipyard. 郭真祥 2006 學位論文 ; thesis 94 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣大學 === 工程科學及海洋工程學研究所 === 95 === New ship building is the order-designed process involves a mass-customized production environment that depends on the availability of the manufacturing processes and materials. How to meet a variety of designated materials requested by customers and how to cope with the quick response for confirmed orders will gradually become important issues for mid-small shipyard. It is difficult to calculate the requirement of materials because the correctness of traditional MRP (Material Requirements Planning) method to expand original materials basis on BOM (Bill of Materials). The thesis uses BOP (Bill of Production) integrated by BOM and Routing process to expand requirement of materials to calculate the demand of material items and quantity of every manufacturing process. This thesis develops the web-based production management system using MicroSoft ASP.Net 2.0 to develop the application and using MicroSoft SQL Server 2005 in Database System. Aimed at the demand of reducing operation process, and deploy material resources efficiently, and reducing the material inventory of mid-small shipyard, so select the Material Requirements Planning information System which is import basis part of ERP (Enterprise Resource Planning) to develop. The goals help business to enhance the prepare material ability and operation support ability, which could improve business’s flexibility and competitive edge of mid-small shipyard.
author2 郭真祥
author_facet 郭真祥
Yun-Lung Lo
羅雲龍
author Yun-Lung Lo
羅雲龍
spellingShingle Yun-Lung Lo
羅雲龍
Development of Material Requirements Planning Information System for Mid-small Size Shipyards
author_sort Yun-Lung Lo
title Development of Material Requirements Planning Information System for Mid-small Size Shipyards
title_short Development of Material Requirements Planning Information System for Mid-small Size Shipyards
title_full Development of Material Requirements Planning Information System for Mid-small Size Shipyards
title_fullStr Development of Material Requirements Planning Information System for Mid-small Size Shipyards
title_full_unstemmed Development of Material Requirements Planning Information System for Mid-small Size Shipyards
title_sort development of material requirements planning information system for mid-small size shipyards
publishDate 2006
url http://ndltd.ncl.edu.tw/handle/35433136076842395332
work_keys_str_mv AT yunlunglo developmentofmaterialrequirementsplanninginformationsystemformidsmallsizeshipyards
AT luóyúnlóng developmentofmaterialrequirementsplanninginformationsystemformidsmallsizeshipyards
AT yunlunglo zhōngxiǎoxíngchuánchǎngwùliàoxūqiúguīhuàzīxùnxìtǒngzhīyánfā
AT luóyúnlóng zhōngxiǎoxíngchuánchǎngwùliàoxūqiúguīhuàzīxùnxìtǒngzhīyánfā
_version_ 1718148450573352960