The Construction of Taoyuan Canal during Japanese-Occupied Period.---A Viewpoint from Sawaigumi---
碩士 === 淡江大學 === 日本研究所碩士在職專班 === 95 === During the period governed by Japan, Taiwan governor-general palace following “Industrialize Japan, Agriculturize Taiwan”policy, in order to replenish Japanese local rice insufficiency, they opened up cultivated land in Taiwan actively, to improve the type of...
Main Authors: | Te-Hsing Fan, 范德星 |
---|---|
Other Authors: | 齋藤司良 |
Format: | Others |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/waz7eh |
Similar Items
-
The construction of the Sun Moon Lake hydraulic power plant during the Japanese-Occupied Period.- A Viewpoint from Kajim -
by: Chun-Hui Yeh, et al.
Published: (2006) -
The development of Sun Moon Lake during the Japanese-Occupied Period
by: Lin,Li-Chun, et al.
Published: (2007) -
The Primary Education of Japanese in The Japanese-Occupied Period in Taiwan
by: SHIONOYA, SACHIKO, et al. -
The Primary Education of Japanese in The Japanese-Occupied Period in Taiwan
by: SHIONOYA, SACHIKO, et al. -
The Study on the Architecture of Meteorological Station in Taiwan During the Japanese-Occupied Period
by: Chien-Chou Tseng, et al.
Published: (2001)