Investigative Research for Whether Foreman of Contractor Understands the Final Valuable Product
碩士 === 中華大學 === 營建管理研究所 === 96 === The key person for implementation at domestic construction industry is foreman. Nevertheless, the majority of ongoing engineering overtly relies upon impromptu directing from foreman, i.e. lack of teamwork, and ultimately this leads to unable to reach the desirable...
Main Authors: | Wei-Ting Dong, 董韋廷 |
---|---|
Other Authors: | Jin-Fang Shr |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/34777449569294117813 |
Similar Items
-
The Study of Foreman Leadership in Professional and Safety
by: HU, TSUNG-YUAN, et al.
Published: (2018) -
What the shoe foreman thinks of management
by: Cartier, Arthur T.
Published: (2017) -
The Evaluation of Foreman Competency Suitability on Consumer Complaints
by: yaffi Arrizki Kusumanugraha
Published: (2018-11-01) -
Productive efficiency: some approaches, techniques, and methods available to the production assembly foreman.
by: Kassis, Henry K
Published: (2016) -
Richard Foreman’s Theater and Giorgio Agamben’s Inoperative Potentiality
by: نرگس منتخبی
Published: (2016-06-01)