Applying Genetic Algorithm to Construct a Production Scheduling Model of Logic IC Testing House: A Case Study
碩士 === 國立成功大學 === 工學院工程管理專班 === 96 === Final test is the major process and cost center with 40%~50% cost of good sold in IC testing house. Hence, to maximize overall equipment effectiveness and deliver finished goods to end customers on time are main daily activities especially for scheduling in IC...
Main Authors: | Shu-Chen Wu, 吳淑貞 |
---|---|
Other Authors: | Yueh-Min Huang |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/48571055134977055538 |
Similar Items
-
A short-term production scheduling for logical IC final testing factory
by: Ta-Chin Lin, et al.
Published: (1997) -
A Study of Tester Scheduling for Logic IC Final Testing
by: Wai-Ting Li, et al.
Published: (2000) -
Studies on Parallel Genetic Algorithms applied to Construction Scheduling
by: Fei-Wen Chen, et al.
Published: (2001) -
Applying Genetic Algorithm to Schedule Brewery Production
by: Bui Xuan Toan, et al.
Published: (2017) -
applying the genetic algorithm to construct shop floor scheduling model for semiconductor testing factories
by: Luo, Sheng-How, et al.
Published: (1996)