Time Limit of Claims for Public Projects

碩士 === 國立高雄第一科技大學 === 營建工程所 === 96 === In accordance with the article pertaining to a public work contractual claim following a catastrophic event within the construction contract period, procedures for a claim should be filed within the construction contract period. However, in the practices of con...

Full description

Bibliographic Details
Main Authors: Chiau-Ling Chan, 陳巧羚
Other Authors: Wei Lo
Format: Others
Language:zh-TW
Published: 2008
Online Access:http://ndltd.ncl.edu.tw/handle/89443521916575537874

Similar Items