Time Limit of Claims for Public Projects
碩士 === 國立高雄第一科技大學 === 營建工程所 === 96 === In accordance with the article pertaining to a public work contractual claim following a catastrophic event within the construction contract period, procedures for a claim should be filed within the construction contract period. However, in the practices of con...
Main Authors: | Chiau-Ling Chan, 陳巧羚 |
---|---|
Other Authors: | Wei Lo |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/89443521916575537874 |
Similar Items
-
The evaluation of time claims in construction projects
by: Standinger, M. L.
Published: (2000) -
An Analysis of Claim Factors in Health Insurance Policy
by: YI-Lin Ling, et al.
Published: (2008) -
Problems associated with evaluation of extension of time (EOT) claim in government projects
by: Mat Isa, Siti Aisah
Published: (2014) -
Claim management in EPC-Projects : A case study of claim causes and claim management during plant installation
by: Söderlund, Matias
Published: (2018) -
Management of Contractor’s Claims in Construction Projects
by: Lukáš Klee
Published: (2013-01-01)