Transient Analyses of Advanced Boiling Water Reactor of Lungmen Nuclear Power Station using RELAP5/MOD3

碩士 === 國立清華大學 === 工程與系統科學系 === 96 === In this study, a reactor system thermohydraulic system analysis code, RELAP5/MOD3 is used to analyzed selected transients in the Final safety analysis report (FSAR) of Lungmen Nuclear Power Stations (NPS).The plant employs two general electric designed Advanced...

Full description

Bibliographic Details
Main Author: 劉紹楷
Other Authors: 李敏
Format: Others
Language:zh-TW
Published: 2008
Online Access:http://ndltd.ncl.edu.tw/handle/38498223830789580516
id ndltd-TW-096NTHU5593084
record_format oai_dc
spelling ndltd-TW-096NTHU55930842015-11-27T04:04:17Z http://ndltd.ncl.edu.tw/handle/38498223830789580516 Transient Analyses of Advanced Boiling Water Reactor of Lungmen Nuclear Power Station using RELAP5/MOD3 核四廠RELAP5/MOD3輸入數據建立與暫態事故分析 劉紹楷 碩士 國立清華大學 工程與系統科學系 96 In this study, a reactor system thermohydraulic system analysis code, RELAP5/MOD3 is used to analyzed selected transients in the Final safety analysis report (FSAR) of Lungmen Nuclear Power Stations (NPS).The plant employs two general electric designed Advanced Boiling Water Reactor (ABWR) with rated power of 1350MWe. The Lungmen input deck of RELAP5/MOD3, models reactor pressure vessel (RPV) and banlance of plant (BOP), which includes major components such as turbines, heat ecxhangers , reheaters, and pumps. The input deck has been successfully initialize to a steady state condition. The internal pump trip and main steam line isolation valves closures transients in FSAR of Lungmen NPS are simulated. The results are compared with the data in FSAR. The comparsion of the simulated results with the results shown in FSAR are not satisfactory due to lack of modeling of the control system in the input deck. 李敏 2008 學位論文 ; thesis 81 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立清華大學 === 工程與系統科學系 === 96 === In this study, a reactor system thermohydraulic system analysis code, RELAP5/MOD3 is used to analyzed selected transients in the Final safety analysis report (FSAR) of Lungmen Nuclear Power Stations (NPS).The plant employs two general electric designed Advanced Boiling Water Reactor (ABWR) with rated power of 1350MWe. The Lungmen input deck of RELAP5/MOD3, models reactor pressure vessel (RPV) and banlance of plant (BOP), which includes major components such as turbines, heat ecxhangers , reheaters, and pumps. The input deck has been successfully initialize to a steady state condition. The internal pump trip and main steam line isolation valves closures transients in FSAR of Lungmen NPS are simulated. The results are compared with the data in FSAR. The comparsion of the simulated results with the results shown in FSAR are not satisfactory due to lack of modeling of the control system in the input deck.
author2 李敏
author_facet 李敏
劉紹楷
author 劉紹楷
spellingShingle 劉紹楷
Transient Analyses of Advanced Boiling Water Reactor of Lungmen Nuclear Power Station using RELAP5/MOD3
author_sort 劉紹楷
title Transient Analyses of Advanced Boiling Water Reactor of Lungmen Nuclear Power Station using RELAP5/MOD3
title_short Transient Analyses of Advanced Boiling Water Reactor of Lungmen Nuclear Power Station using RELAP5/MOD3
title_full Transient Analyses of Advanced Boiling Water Reactor of Lungmen Nuclear Power Station using RELAP5/MOD3
title_fullStr Transient Analyses of Advanced Boiling Water Reactor of Lungmen Nuclear Power Station using RELAP5/MOD3
title_full_unstemmed Transient Analyses of Advanced Boiling Water Reactor of Lungmen Nuclear Power Station using RELAP5/MOD3
title_sort transient analyses of advanced boiling water reactor of lungmen nuclear power station using relap5/mod3
publishDate 2008
url http://ndltd.ncl.edu.tw/handle/38498223830789580516
work_keys_str_mv AT liúshàokǎi transientanalysesofadvancedboilingwaterreactoroflungmennuclearpowerstationusingrelap5mod3
AT liúshàokǎi hésìchǎngrelap5mod3shūrùshùjùjiànlìyǔzàntàishìgùfēnxī
_version_ 1718137957787893760