A Study on Construction Project Management Using Critical Chain

碩士 === 國立臺灣大學 === 土木工程學研究所 === 96 === In the Project Management nowadays, Critical Path Method has been the main managing method used here. However, Doctor Goldratt revealed the blind spot of Critical Path Method and, based on his early work, the Theory of Constraints, proposed a new concept for pro...

Full description

Bibliographic Details
Main Authors: Jui-Shin Tu, 涂瑞欣
Other Authors: 曾惠斌
Format: Others
Language:zh-TW
Published: 2008
Online Access:http://ndltd.ncl.edu.tw/handle/72568645180403207963
id ndltd-TW-096NTU05015055
record_format oai_dc
spelling ndltd-TW-096NTU050150552016-05-11T04:16:49Z http://ndltd.ncl.edu.tw/handle/72568645180403207963 A Study on Construction Project Management Using Critical Chain 工程專案排程管控導入關鍵鏈管理方法之研究 Jui-Shin Tu 涂瑞欣 碩士 國立臺灣大學 土木工程學研究所 96 In the Project Management nowadays, Critical Path Method has been the main managing method used here. However, Doctor Goldratt revealed the blind spot of Critical Path Method and, based on his early work, the Theory of Constraints, proposed a new concept for project management, known as Critical Chain. Nevertheless the Critical Chain Scheduling Method hasn’t been wildly used in domestic engineering projects. It may because the 50% reduction of duration estimates or the uncertainties of buffer calculation and buffer management that can hardly be applied in real cases. This study adduces a simple architect construction project, and uses the software assisted to CCSM, Project Scheduler 8, analyzes its results, then designs, and distributes the questionnaires. Also by applying the Fuzzy Statistics, the study learnt the minimum time that could spend in some important activities; moreover, to ascertain the ratio of reduction of these activities in the case. Since CCSM hasn’t been wildly used around the construction projects, this study builds up a process to acquire the ratio of reduction of duration estimates, hoping to support construction management while leading-in CCSM. 曾惠斌 2008 學位論文 ; thesis 99 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣大學 === 土木工程學研究所 === 96 === In the Project Management nowadays, Critical Path Method has been the main managing method used here. However, Doctor Goldratt revealed the blind spot of Critical Path Method and, based on his early work, the Theory of Constraints, proposed a new concept for project management, known as Critical Chain. Nevertheless the Critical Chain Scheduling Method hasn’t been wildly used in domestic engineering projects. It may because the 50% reduction of duration estimates or the uncertainties of buffer calculation and buffer management that can hardly be applied in real cases. This study adduces a simple architect construction project, and uses the software assisted to CCSM, Project Scheduler 8, analyzes its results, then designs, and distributes the questionnaires. Also by applying the Fuzzy Statistics, the study learnt the minimum time that could spend in some important activities; moreover, to ascertain the ratio of reduction of these activities in the case. Since CCSM hasn’t been wildly used around the construction projects, this study builds up a process to acquire the ratio of reduction of duration estimates, hoping to support construction management while leading-in CCSM.
author2 曾惠斌
author_facet 曾惠斌
Jui-Shin Tu
涂瑞欣
author Jui-Shin Tu
涂瑞欣
spellingShingle Jui-Shin Tu
涂瑞欣
A Study on Construction Project Management Using Critical Chain
author_sort Jui-Shin Tu
title A Study on Construction Project Management Using Critical Chain
title_short A Study on Construction Project Management Using Critical Chain
title_full A Study on Construction Project Management Using Critical Chain
title_fullStr A Study on Construction Project Management Using Critical Chain
title_full_unstemmed A Study on Construction Project Management Using Critical Chain
title_sort study on construction project management using critical chain
publishDate 2008
url http://ndltd.ncl.edu.tw/handle/72568645180403207963
work_keys_str_mv AT juishintu astudyonconstructionprojectmanagementusingcriticalchain
AT túruìxīn astudyonconstructionprojectmanagementusingcriticalchain
AT juishintu gōngchéngzhuānànpáichéngguǎnkòngdǎorùguānjiànliànguǎnlǐfāngfǎzhīyánjiū
AT túruìxīn gōngchéngzhuānànpáichéngguǎnkòngdǎorùguānjiànliànguǎnlǐfāngfǎzhīyánjiū
AT juishintu studyonconstructionprojectmanagementusingcriticalchain
AT túruìxīn studyonconstructionprojectmanagementusingcriticalchain
_version_ 1718264820770275328