Deformation of The Soil Tunnel by the NATM
碩士 === 國立臺灣科技大學 === 營建工程系 === 96 === The purpose of this study is to investigate the behavior of the soil tunnel, located in HOKOU, by the NATM using monitoring data and numerical analysis and find out why over-settlement during excavation is produced. The results can be used to predict and control...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/00466753924878638285 |
id |
ndltd-TW-096NTUS5512096 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-096NTUS55120962016-05-13T04:15:17Z http://ndltd.ncl.edu.tw/handle/00466753924878638285 Deformation of The Soil Tunnel by the NATM 新奧工法於土壤隧道之開挖行為研究 Che-Chun Su 蘇哲雋 碩士 國立臺灣科技大學 營建工程系 96 The purpose of this study is to investigate the behavior of the soil tunnel, located in HOKOU, by the NATM using monitoring data and numerical analysis and find out why over-settlement during excavation is produced. The results can be used to predict and control the settlement of tunnel during excavation in the future. This study uses Plaxis 8.6, a plane strain finite element program, with the stress reduction method, to simulate the three-dimensional behavior of tunnel excavation. Compared with the in-situ measurement data, a reasonable simulation method is established. It is found from this study that range of the tunnel deformation induced by excavation is about 2.5 times tunnel diameter from the excavation face. A minimum of 2.0 m between the bench and invert excavation faces should be maintained to ensure the safety of tunnels during construction. It is found from the numerical analysis that the main settlement happened during tunnel heading excavation, which accounts for about 85% of the total settlement. Chang-Yu Ou 歐章煜 2008 學位論文 ; thesis 145 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺灣科技大學 === 營建工程系 === 96 === The purpose of this study is to investigate the behavior of the soil tunnel, located in HOKOU, by the NATM using monitoring data and numerical analysis and find out why over-settlement during excavation is produced. The results can be used to predict and control the settlement of tunnel during excavation in the future. This study uses Plaxis 8.6, a plane strain finite element program, with the stress reduction method, to simulate the three-dimensional behavior of tunnel excavation. Compared with the in-situ measurement data, a reasonable simulation method is established. It is found from this study that range of the tunnel deformation induced by excavation is about 2.5 times tunnel diameter from the excavation face. A minimum of 2.0 m between the bench and invert excavation faces should be maintained to ensure the safety of tunnels during construction. It is found from the numerical analysis that the main settlement happened during tunnel heading excavation, which accounts for about 85% of the total settlement.
|
author2 |
Chang-Yu Ou |
author_facet |
Chang-Yu Ou Che-Chun Su 蘇哲雋 |
author |
Che-Chun Su 蘇哲雋 |
spellingShingle |
Che-Chun Su 蘇哲雋 Deformation of The Soil Tunnel by the NATM |
author_sort |
Che-Chun Su |
title |
Deformation of The Soil Tunnel by the NATM |
title_short |
Deformation of The Soil Tunnel by the NATM |
title_full |
Deformation of The Soil Tunnel by the NATM |
title_fullStr |
Deformation of The Soil Tunnel by the NATM |
title_full_unstemmed |
Deformation of The Soil Tunnel by the NATM |
title_sort |
deformation of the soil tunnel by the natm |
publishDate |
2008 |
url |
http://ndltd.ncl.edu.tw/handle/00466753924878638285 |
work_keys_str_mv |
AT chechunsu deformationofthesoiltunnelbythenatm AT sūzhéjuàn deformationofthesoiltunnelbythenatm AT chechunsu xīnàogōngfǎyútǔrǎngsuìdàozhīkāiwāxíngwèiyánjiū AT sūzhéjuàn xīnàogōngfǎyútǔrǎngsuìdàozhīkāiwāxíngwèiyánjiū |
_version_ |
1718268337478172672 |