Dynamic Dispatching Rule Considering Bottleneck Resources in Semiconductor Assembly Factory

碩士 === 國立臺北科技大學 === 工業工程與管理研究所 === 96 === The research is based on a case of semiconductor assembly factory in North Taiwan. The current dispatching rule of the factory is based on accumulate cycle times only. We know that setups are needed when different package type is processed successively at bo...

Full description

Bibliographic Details
Main Authors: Jin-Lin Huo, 霍錦霖
Other Authors: 張玉鈍
Format: Others
Language:zh-TW
Published: 2008
Online Access:http://ndltd.ncl.edu.tw/handle/7a2mt5
id ndltd-TW-096TIT05031051
record_format oai_dc
spelling ndltd-TW-096TIT050310512019-08-01T03:45:30Z http://ndltd.ncl.edu.tw/handle/7a2mt5 Dynamic Dispatching Rule Considering Bottleneck Resources in Semiconductor Assembly Factory 考量瓶頸資源之動態派工-以半導體封裝廠為例 Jin-Lin Huo 霍錦霖 碩士 國立臺北科技大學 工業工程與管理研究所 96 The research is based on a case of semiconductor assembly factory in North Taiwan. The current dispatching rule of the factory is based on accumulate cycle times only. We know that setups are needed when different package type is processed successively at bonding and molding stations. Since the setup time could last few minutes to hours, the WIP in front of bonding and molding stations fluctuates so much that two stages of processes become bottlenecks in irregular pattern. That means bottleneck shifting. The research is devoted to build the factory simulation model and develop dynamic dispatching rule considering bottleneck resources. The purpose is to decrease the situation of bottleneck shifting, reduce average cycle time, and increase throughput. In order to find the suitable were conducted parameter setting for the dynamic dispatching rule, in assembly area, different experiments. The result shows that dynamic dispatching rule can decrease average CT significantly, especially at molding station where the improvement is about 25%, and also increase average TH. When the parameters were set to BL2 as 0.75 days, BM1 as 4 hours, BM2 as 8 hours, and ML2 as 6.3 days, CT is reduced significantly. When the parameters were set to BL2 as 1.25 days, BM1 as 8 hours, BM2 as 8 hours, and ML2 as 2.7 days, TH is increased significantly. When the parameters were set to BL2 as between 0.75 and 1.25 days, BM1 as between 4 and 8 hours, BM2 as 8 hours, and ML2 as 4.5 days, CT and TH are both improved at assembly factory. 張玉鈍 2008 學位論文 ; thesis 67 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺北科技大學 === 工業工程與管理研究所 === 96 === The research is based on a case of semiconductor assembly factory in North Taiwan. The current dispatching rule of the factory is based on accumulate cycle times only. We know that setups are needed when different package type is processed successively at bonding and molding stations. Since the setup time could last few minutes to hours, the WIP in front of bonding and molding stations fluctuates so much that two stages of processes become bottlenecks in irregular pattern. That means bottleneck shifting. The research is devoted to build the factory simulation model and develop dynamic dispatching rule considering bottleneck resources. The purpose is to decrease the situation of bottleneck shifting, reduce average cycle time, and increase throughput. In order to find the suitable were conducted parameter setting for the dynamic dispatching rule, in assembly area, different experiments. The result shows that dynamic dispatching rule can decrease average CT significantly, especially at molding station where the improvement is about 25%, and also increase average TH. When the parameters were set to BL2 as 0.75 days, BM1 as 4 hours, BM2 as 8 hours, and ML2 as 6.3 days, CT is reduced significantly. When the parameters were set to BL2 as 1.25 days, BM1 as 8 hours, BM2 as 8 hours, and ML2 as 2.7 days, TH is increased significantly. When the parameters were set to BL2 as between 0.75 and 1.25 days, BM1 as between 4 and 8 hours, BM2 as 8 hours, and ML2 as 4.5 days, CT and TH are both improved at assembly factory.
author2 張玉鈍
author_facet 張玉鈍
Jin-Lin Huo
霍錦霖
author Jin-Lin Huo
霍錦霖
spellingShingle Jin-Lin Huo
霍錦霖
Dynamic Dispatching Rule Considering Bottleneck Resources in Semiconductor Assembly Factory
author_sort Jin-Lin Huo
title Dynamic Dispatching Rule Considering Bottleneck Resources in Semiconductor Assembly Factory
title_short Dynamic Dispatching Rule Considering Bottleneck Resources in Semiconductor Assembly Factory
title_full Dynamic Dispatching Rule Considering Bottleneck Resources in Semiconductor Assembly Factory
title_fullStr Dynamic Dispatching Rule Considering Bottleneck Resources in Semiconductor Assembly Factory
title_full_unstemmed Dynamic Dispatching Rule Considering Bottleneck Resources in Semiconductor Assembly Factory
title_sort dynamic dispatching rule considering bottleneck resources in semiconductor assembly factory
publishDate 2008
url http://ndltd.ncl.edu.tw/handle/7a2mt5
work_keys_str_mv AT jinlinhuo dynamicdispatchingruleconsideringbottleneckresourcesinsemiconductorassemblyfactory
AT huòjǐnlín dynamicdispatchingruleconsideringbottleneckresourcesinsemiconductorassemblyfactory
AT jinlinhuo kǎoliàngpíngjǐngzīyuánzhīdòngtàipàigōngyǐbàndǎotǐfēngzhuāngchǎngwèilì
AT huòjǐnlín kǎoliàngpíngjǐngzīyuánzhīdòngtàipàigōngyǐbàndǎotǐfēngzhuāngchǎngwèilì
_version_ 1719231771468365824