Cost analysis & reduction of TFT-LCD clean room construction
碩士 === 國立中興大學 === 機械工程學系所 === 97 === Clean room was built to meet strict environment requirement of high-tech industry process. TFT-LCD panel market competition is so intense that all makers construct new fab continuously to keep economical scale. Annual expenses for clean room construction of this...
Main Authors: | Kuang-Liang Lin, 林光亮 |
---|---|
Other Authors: | 簡瑞與 |
Format: | Others |
Language: | zh-TW |
Online Access: | http://ndltd.ncl.edu.tw/handle/88710984164471112890 |
Similar Items
-
TFT-LCD Construction Risk Assessment of Clean Room Fire
by: Fa-Kuei Chen, et al.
Published: (2006) -
Studies of Airflow Uniformity and Pollutant Dispersion in a TFT-LCD Clean Room
by: Chao-Wen Chen, et al.
Published: (2009) -
A Classification Study of Explosion Hazardous Areas in TFT-LCD Clean Rooms
by: Cheng-Chih Chen, et al.
Published: (2014) -
Analysis and Improvement of TFT-LCD Clean Process in the Polarizer Film Rework
by: Chun-MuLin, et al.
Published: (2012) -
Air flow field and gas detectors optimal distribution of Clean Room – A case study of TFT-LCD
by: Chang, Hsueh-Ju, et al.
Published: (2015)